<strong>Forthbank</strong> <strong>Wind</strong> <strong>Energy</strong> <strong>Development</strong><br />

10.5.6 ASDA depot, New Bankside Industrial Estate, is located some 9 kilometres south of the<br />

proposed wind energy development. The development comprises a single turbine on a site<br />

with intervening development between it and the proposed wind energy development. Although<br />

a number of cultural heritage features are located within the combined ZTV, it is unlikely that<br />

there would be a significant cumulative effect on the settings of cultural heritage features.<br />

10.5.7 Craigengelt is located 17 kilometres south west of the proposed wind energy development.<br />

The combined ZVI with the proposed Craigengelt development is shown on Figure CZTV 9.7.<br />

This indicates that the area within a 3 kilometre radius of the proposed wind energy<br />

development would lie within the combined ZTV. Given the distance between the proposed<br />

Craigengelt development and the proposed wind energy development, the cumulative effect is<br />

unlikely to be significant. In addition it is noted that although Bannockburn Battlefield, part of<br />

which lies within a conservation area, is located within the combined ZTV, in practice<br />

intervening development means that the cumulative effect is unlikely to be significant.<br />

10.5.8 Burnfoot Hill is located some 10.2 kilometres north of the proposed wind energy development.<br />

The combined ZVI with the proposed Burnfoot Hill development is shown on Figure CZTV 9.8.<br />

This indicates that none of the area within a 10 kilometre radius of the proposed wind energy<br />

development would lie within the combined ZTV. The combined the cumulative effect is likely<br />

to be negligible.<br />

10.5.9 Muirpark is located some 16 kilometres west of the proposed wind energy development. The<br />

combined ZVI with the proposed Muirpark development is shown on Figure CZTV 9.16. This<br />

indicates that much of the area within a 3 kilometre radius of the proposed wind energy<br />

development would lie within the combined ZTV. Given the distance between the proposed<br />

Muirpark development and the proposed wind energy development, the cumulative effect is<br />

unlikely to be significant.<br />

10.6 Mitigation<br />

10.6.1 The whole of the proposed wind energy development is within an area that has been<br />

previously disturbed through mining and/or landfill activities. On this basis the potential <strong>for</strong><br />

previously undiscovered archaeological remains is considered to be negligible.<br />

10.6.2 Mitigation measures <strong>for</strong> the proposed wind energy development have been incorporated into<br />

the site design. The turbine layout has considered both direct and indirect impacts on cultural<br />

heritage features while the locations of access tracks, the construction compound etc. has<br />

given to consideration the likely effect on below ground archaeology.<br />

10.7 Residual Effects<br />

10.7.1 Any direct effect on cultural heritage features, including identified and unidentified on-site<br />

archaeology would be permanent and non-reversible. No such effects are predicted.<br />

10.7.2 Any effect on the settings of cultural heritage features would be temporary and reversible<br />

following the end of use and de-commissioning of the proposed wind energy development.<br />

November 2010 Chapter 10 Page 42<br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> <strong>Development</strong> Co. Ltd 2010 ©