20.05.2014 Views

Forthbank Wind Energy Development - Partnerships for Renewables

Forthbank Wind Energy Development - Partnerships for Renewables

Forthbank Wind Energy Development - Partnerships for Renewables

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Forthbank</strong> <strong>Wind</strong> <strong>Energy</strong> <strong>Development</strong><br />

No response received<br />

No issues raised/no objections<br />

Air and Climate<br />

Archaeology/Cultural Heritage<br />

Aviation<br />

Construction works<br />

Cumulative Effects<br />

Ecology<br />

Excavation of Borrow Pits<br />

Forest Clearance<br />

Hydrology/Geology<br />

Landscape and Visual<br />

Land Use<br />

Noise<br />

Ornithology<br />

Policy Consideration<br />

Recreation/Tourism<br />

Safety/Risk<br />

Socio-economic<br />

Transport, access and traffic<br />

Telecom/communications<br />

Water Environment<br />

Waste Management<br />

Operational Works<br />

Scottish Ambulance Service X<br />

Scottish Badgers X<br />

Scottish Enterprise X<br />

Scottish Environmental Protection<br />

X X X X X X X X X<br />

Agency (SEPA)<br />

Scotland Gas Networks<br />

X<br />

Scottish Natural Heritage (SNH), Argill<br />

X X X X X X<br />

and Stirling Office<br />

Scottish Police Services Authority X<br />

Scottish Power-<strong>Energy</strong> Networks<br />

X<br />

Scottish Rights of Way and Access X<br />

Society (ScotWays)<br />

Scottish Water Horizons X<br />

Scottish Wildlife Trust X<br />

Stirling Archaeology Services X<br />

Stirling and Clackmannan<br />

X<br />

Constabulary<br />

Stirling Community Centre X<br />

Stirling Council X X<br />

Sustrans X<br />

The Coal Authority<br />

Tillicoultry Community Council X<br />

Tmobile X<br />

Transport Scotland<br />

X<br />

Tullybody, Cambus & Glenochil X<br />

Community Council<br />

Visit Scotland X<br />

Vodafone X<br />

Table 3.2 Summary of Responses from Consultees<br />

Consultee Response Chapter where<br />

Response is<br />

Alva Community<br />

Council<br />

Arqiva<br />

BAA<br />

BBC<br />

BT<br />

10/05/10 - Confirmed that it was raised at meeting, and if one had an<br />

issue to contact Keith Johnstone at Clackmannanshire Council.<br />

08/07/09 - Arqiva is satisfied that there is sufficient distance between<br />

its links and the proposed turbines.<br />

It requests to be in<strong>for</strong>med of any change of location or additional<br />

turbines.<br />

10/09/08 -The proposed wind farm lies 30km north west from the<br />

Aerodrome Reference Point <strong>for</strong> Edinburgh Airport. The assessment<br />

shows that the turbines would not be visible to the radars at either<br />

Edinburgh or Glasgow airports. They will be visible to the radar at<br />

Kincardine but this will not have an adverse impact on the safe and<br />

efficient operations of either Edinburgh or Glasgow airports. There<strong>for</strong>e<br />

an objection would not be raised.<br />

12/07/10 – The BBC <strong>Wind</strong> Farm Tool suggests that there is likely<br />

potential <strong>for</strong> the following transmitters to be affected: Black Hill Ch5,<br />

Craigkelly Ch5, Black Hill and Craigkelly. At this stage it is difficult to<br />

quantity effects until analogue signals are turned off and the digital<br />

switchover is implemented. PfR envisages that digital TV will<br />

dramatically reduce any potential interference with TV signals. It is<br />

proposed that once the turbines are operational if any complaints are<br />

received these would be investigated by an independent engineer to<br />

verify if the turbines are the cause and if so rectify the problem.<br />

08/08/08 - BT concluded that the proposed wind energy development<br />

should not cause interference to its current and presently planned<br />

Addressed<br />

N/A<br />

Chapter 3 –<br />

Scheme<br />

<strong>Development</strong> etc<br />

Planning Statement<br />

Planning Statement<br />

Planning Statement<br />

November 2010 Chapter 3 Page 7<br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> <strong>Development</strong> Co. Ltd 2010 ©

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!