20.05.2014 Views

Forthbank Wind Energy Development - Partnerships for Renewables

Forthbank Wind Energy Development - Partnerships for Renewables

Forthbank Wind Energy Development - Partnerships for Renewables

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Forthbank</strong> <strong>Wind</strong> <strong>Energy</strong> <strong>Development</strong><br />

Table 10.23 World Heritage Sites Beyond 10km of the Application Area and Partly Within<br />

ZTV<br />

Site Name<br />

Antonine Wall<br />

10.4 Assessment of Effects<br />

Importance/<br />

Sensitivity<br />

National/Very High<br />

Potential Effects<br />

Core Study Area<br />

Sites Within the Application Area<br />

10.4.1 There is one site listed in the Historic Environment Record within the application area. This is a<br />

<strong>for</strong>mer airfield and aircraft factory. (Stirling SMR number 6673, (NMRS number NS89SE 238).<br />

The Stirling SMR notes that “The British Caudron Company (of Cricklewood and Alloa) was<br />

established in 1916. The airfield adjoining the factory was used <strong>for</strong> test flights and the factory<br />

opened in 1916.”<br />

10.4.2 The large aircraft factory buildings themselves were located outside the application area on the<br />

shoreline. They have been removed and there would be no direct or indirect impact on them. A<br />

series of smaller buildings, presumably accommodation and/or offices, arranged around four<br />

squares were also shown on early OS maps. They had been demolished by the end of 1945<br />

but survived as a distinct series of earthworks. By 1952 mining operations removed the<br />

earthworks and the area was later built over by the refuse destructor. The site visit indicated<br />

that there were no visible standing remains of the buildings on the ground.<br />

10.4.3 The site is of local importance. The proposed wind energy development would have a neutral<br />

impact and the significance of effect would be neutral.<br />

10.4.4 The whole of the proposed wind energy development is within an area that has been<br />

previously disturbed through mining and/or landfill activities. On this basis the potential <strong>for</strong><br />

previously undiscovered archaeological remains is considered to be negligible.<br />

10.4.5 There are no Scheduled Monuments, Listed Buildings, Conservation Areas or sites recorded in<br />

the Inventory of Gardens and Designed Landscapes within the application area. There would<br />

be no direct or indirect impact on any other site within the application area.<br />

10.4.6 There are several Historic Landscape Character Areas (HCLA) within the proposed wind<br />

energy development area (Figure 10.7). The south-eastern area is characterised as a <strong>for</strong>mer<br />

landfill, the centre as access roads to the landfill and the northern-western area as grass land.<br />

10.4.7 The HLCAs are of local importance. The magnitude of impact would be minor adverse. The<br />

significance of effect of the proposed wind energy development would be slight adverse.<br />

November 2010 Chapter 10 Page 21<br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> <strong>Development</strong> Co. Ltd 2010 ©

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!