20.05.2014 Views

Forthbank Wind Energy Development - Partnerships for Renewables

Forthbank Wind Energy Development - Partnerships for Renewables

Forthbank Wind Energy Development - Partnerships for Renewables

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Forthbank</strong> <strong>Wind</strong> <strong>Energy</strong> <strong>Development</strong><br />

14.8 Summary of Effects<br />

Table 14.3 Summary of Effects<br />

Potential Effect Mitigation Residual Effect<br />

Shutdowns of appropriate turbine/s<br />

at the necessary times.<br />

Potential <strong>for</strong> shadow flicker to occur at<br />

properties within a distance of 900m.<br />

14.9 Proposed Monitoring<br />

Shadow flicker unlikely to affect any<br />

properties.<br />

14.9.1 During the site commissioning process a programme of shadow flicker monitoring will be<br />

conducted. The details of which will be agreed with Clackmannanshire Council’s<br />

Environmental Health Department in advance.<br />

14.10 Statement of Significance<br />

14.10.1 Given the short duration of the predicted events up to 20 hours per receptor per year and<br />

taking into consideration other factors such as cloud cover, times when turbines are not<br />

operating, turbines not facing the receptor ‘square-on’, assuming no visual/topographical<br />

barriers between the residential properties/receptors and the proposed mitigation measures,<br />

the effects are deemed to be not significant.<br />

November 2010 Chapter 14 Page 16<br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> <strong>Development</strong> Co. Ltd 2010 ©

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!