<strong>Forthbank</strong> <strong>Wind</strong> <strong>Energy</strong> <strong>Development</strong><br />

of 20 kilometres have been considered as beyond this distance cumulative effects are unlikely<br />

to be significant. Advice from Scottish Natural Heritage Guidance on the Cumulative Effects of<br />

<strong>Wind</strong>farms 2005 notes that An assessment of cumulative effects associated with a specific<br />

development proposal should be limited to the effects of the proposal in combination with:<br />

• existing development, either built or under construction;<br />

• approved development, awaiting implementation; and<br />

• proposals awaiting determination within the planning process, and thus <strong>for</strong> which<br />

design in<strong>for</strong>mation is in the public domain. Proposals and design in<strong>for</strong>mation may be<br />

deemed to be in the public domain once an application has been lodged, and the<br />

decision-making authority has <strong>for</strong>mally registered the application.<br />

10.5.2 The guidance (paragraph 19) goes on to note that cumulative assessment should normally be<br />

limited to the categories set out in paragraph 18.<br />

10.5.3 On this basis, wind energy developments (excluding those in scoping) within a 20 kilometres<br />

radius of the proposed wind energy development are assessed and shown in Table 10.42,<br />

below:<br />

Table 10.42 <strong>Wind</strong> <strong>Energy</strong> <strong>Development</strong>s within 20km of the Application Area<br />

<strong>Wind</strong> energy<br />

development<br />

LCU<br />

Grid Ref.<br />

(approx.)<br />

Distance to<br />

<strong>Forthbank</strong><br />

(approx.)<br />

No. of<br />

turbines<br />

Installed<br />

Greenknowes Ochil Hills NN 968 075 16km 18 95<br />

Earlsburn Fintry, Gargunnock and Touch Hills NS 703 897 20km 14 115<br />

ASDA depot, New Denny/Falkirk Urban Fringe NS 901 820 9km 1 120<br />

Bankside Ind' Estate<br />

Craigengelt Fintry, Gargunnock and Touch Hills NS 724 866 17km 8 125<br />

Burnfoot Hill Ochil Hills NN 905 035 10km 13 102<br />

Application<br />

Muirpark Fintry, Gargunnock and Touch Hills NS 736 875 16km 11 127<br />

Height<br />

to tip<br />

(m)<br />

10.5.4 Greenknowes is located some 16 kilometres north of the proposed wind energy development.<br />

The combined ZVI with the proposed Greenknowes development is shown on Figure CZTV<br />

9.2. This indicates that none of the area within 3 kilometre radius and little of the area within a<br />

10 kilometre radius of the proposed wind energy development would lie within the combined<br />

ZTV. The combined the cumulative effect is likely to be negligible.<br />

10.5.5 Earlsburn is located some 20 kilometres west of the proposed wind energy development. The<br />

combined ZVI with the proposed Earlsburn development is shown on Figure CZTV 9.4. This<br />

indicates that much of the area within a 3 kilometre radius of the proposed wind energy<br />

development would lie within the combined ZTV. Given the distance between the proposed<br />

Earlsburn development and the proposed wind energy development however, the cumulative<br />

effect is unlikely to be significant.<br />

November 2010 Chapter 10 Page 41<br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> <strong>Development</strong> Co. Ltd 2010 ©