20.05.2014 Views

Forthbank Wind Energy Development - Partnerships for Renewables

Forthbank Wind Energy Development - Partnerships for Renewables

Forthbank Wind Energy Development - Partnerships for Renewables

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Forthbank</strong> <strong>Wind</strong> <strong>Energy</strong> <strong>Development</strong><br />

15-25, Bowhouse Gardens/Riverside View (H4)<br />

14.4.5 At 15-25, Bowhouse Gardens/Riverside View the east and south façades are likely to be<br />

affected by shadow flicker <strong>for</strong> turbine 1 <strong>for</strong> approximately 17 hours per year. This would occur<br />

from November to January between approximately 10.30am and 12.00pm, as shown in Charts<br />

9 and 10, and would last up to 82 minutes per day, with an average of 72 minutes. The west<br />

facing façade is not predicted to be affected.<br />

11-13 Riverside View (H5) and 7-9 Riverside View (H6)<br />

14.4.6 At these properties the east and south façades are likely to be affected by shadow flicker <strong>for</strong><br />

turbine 1 <strong>for</strong> approximately 17.5 hours per year. This would occur from November to January<br />

between approximately 11.00am and 13.00pm, as shown in Charts 11, 12, 13 and 14 and<br />

would last up to 86 minutes per day, with an average of 74 minutes. The west facing façade is<br />

not predicted to be affected.<br />

3-5 Riverside View (H7) and 1 Riverside View (H8)<br />

14.4.7 At these properties the south and west façades are likely to be affected by shadow flicker <strong>for</strong><br />

turbine 1 <strong>for</strong> approximately 17 hours per year. This would occur from November to January<br />

between approximately 11.30am and 13.00pm, as shown in Charts 15, 16, 17 and 18, and<br />

would last up to 85 minutes per day, with an average of 72 minutes. The east facing façade is<br />

not predicted to be affected.<br />

10-11 Earls Court (H9), 12-13 Earls Court (H10), 14-15 Earls Court (H11) and 15A Earls<br />

Court (H12)<br />

14.4.8 At these properties the south and west façades are likely to be affected by shadow flicker <strong>for</strong><br />

turbine 1 <strong>for</strong> approximately 13.5 hours per year. This would occur from November to January<br />

between approximately 11.30am and 13.00pm, as shown in Charts 19 to 26, and would last up<br />

to 77 minutes per day, with an average of 65 minutes. The east facing façade is not predicted<br />

to be affected.<br />

1 Arran Court (H13)<br />

14.4.9 At this property the east and south façades are likely to be affected by shadow flicker <strong>for</strong><br />

turbine 1 <strong>for</strong> approximately 10 hours per year. This would occur from November to January<br />

between approximately 10.00am and 11.00am, as shown in Charts 27 and 28, and would last<br />

up to 60 minutes per day, with an average of 52 minutes. The west facing façade is not<br />

predicted to be affected.<br />

11 Shetland Court (H14)<br />

14.4.10 At this property the east and south façades are likely to be affected by shadow flicker <strong>for</strong><br />

turbine 1 <strong>for</strong> approximately 4 hours per year. This would occur from December to January<br />

between approximately 11.30am and 12.30am, as shown in Charts 29 and 30, and would last<br />

November 2010 Chapter 14 Page 12<br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> <strong>Development</strong> Co. Ltd 2010 ©

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!