20.05.2014 Views

Forthbank Wind Energy Development - Partnerships for Renewables

Forthbank Wind Energy Development - Partnerships for Renewables

Forthbank Wind Energy Development - Partnerships for Renewables

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Forthbank</strong> <strong>Wind</strong> <strong>Energy</strong> <strong>Development</strong><br />

3.6 Approach to Public Consultation<br />

3.6.1 Public consultation is a key element of the environmental assessment process; there<strong>for</strong>e as<br />

part of the wider consultation process, attention was given to community engagement, in<br />

con<strong>for</strong>mity with PAN 81: Community Engagement – Planning with People. Local Community<br />

Councils were contacted during development of the proposal.<br />

3.6.2 As it is proposed that the capacity of the proposed wind energy development will be up to<br />

10MW, it is not classed as a major development under The Town and Country Planning<br />

(Hierarchy of <strong>Development</strong>s) (Scotland) Regulations 2009, as it will not exceed 20MW.<br />

There<strong>for</strong>e, <strong>for</strong>mal pre-application consultation with communities is not required. However, PfR<br />

is committed to working together with local communities as part of the community engagement<br />

process and has aimed to ensure that they were consulted with and in<strong>for</strong>med of developments<br />

during the EIA wind energy development process via public exhibitions, meetings and<br />

circulars.<br />

3.6.3 PfR and its consultants have undertaken extensive discussions with statutory and nonstatutory<br />

consultees, the local community and Clackmannanshire Council with the<br />

accumulated findings all having an influence over the evolution of the design and the scope of<br />

the EIA.<br />

3.6.4 Consultation begins at the earliest stage of development to establish feasibility and progresses<br />

right through the application.<br />

3.6.5 Primary methods of engaging the community were as follows:<br />

• Public Exhibitions;<br />

• Dedicated project microsite;<br />

• Community telephone number and email;<br />

• Community websites such as Clacksweb ;<br />

• Personal Meetings;<br />

• Presentations;<br />

• Phone calls;<br />

• Emails;<br />

• Letters; and<br />

• Local Publications.<br />

3.6.6 Public In<strong>for</strong>mation Exhibitions were held on 3 November 2009 (14.00 to 20.00) and 8 July 2010<br />

(16.00 to 20.00) at the Bowmar Community Centre, as well as 17 September 2010 (16.00 to<br />

20.00) at the Airth Community Hall to provide in<strong>for</strong>mation regarding the proposed wind energy<br />

development to local residents, and to gain feedback on the proposals. The events were<br />

November 2010 Chapter 3 Page 11<br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> <strong>Development</strong> Co. Ltd 2010 ©

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!