<strong>Forthbank</strong> <strong>Wind</strong> <strong>Energy</strong> <strong>Development</strong><br />

13.4.66 Landfill gas may collect in confined spaces including turbine foundations and services<br />

trenches.<br />

13.4.67 The magnitude of these impacts on the landfill is considered to be moderate.<br />

Restored Area<br />

13.4.68 The foundations in any made ground in the north-western part of the site may also be impacted<br />

by aggressive ground conditions. This may impact on the integrity of the turbine foundations.<br />

13.4.69 The magnitude of these impacts is considered to be moderate.<br />

Potential De-commissioning Effects<br />

13.4.70 The proposed wind energy development will be operational <strong>for</strong> 25 years. Following this period,<br />

if the operational period is not extended, the proposed wind energy development will be decommissioned<br />

and the site reinstated as approved by the appropriate authority.<br />

13.4.71 Potential effects of the de-commissioning phase are expected to be similar in nature but to a<br />

lesser extent than those of the construction phase, and have not been assessed further.<br />

13.5 Cumulative Effects<br />

13.5.1 32 cumulative sites, within 35km of the site, were considered within Chapter 9 Landscape and<br />

Visual Impact Assessment. Sites considered were:<br />

Table 13.11 Cumulative <strong>Wind</strong> Farms<br />

<strong>Wind</strong> Farm Status No.<br />

Turbines<br />

Height to<br />

Tip (m)<br />

Distance<br />

(km)<br />

Bearing<br />

from Site<br />

Craigengelt Installed 8 125 17 256<br />

ASDA depot, New Bankside Ind' Estate Installed 1 120 9 174<br />

Braes of Doune Installed 35 100 22 318<br />

Braiden Hill Installed 1 100 28 212<br />

Earlsburn Installed 14 115 20 265<br />

Greendykeside <strong>Wind</strong> Farm Installed 2 100 22 203<br />

Greenknowes Installed 18 95 16 25<br />

AG Barr Factory, Lanarkshire Approved 1 126 26 225<br />

Burnfoot Hill Approved 13 102 10 184<br />

Earlsburn North Approved 9 115 20 265<br />

FMC Technologies, Fife Approved 1 100 21 105<br />

Little Raith <strong>Wind</strong>farm Approved 9 100 28 88<br />

Lochelbank Approved 24 91 30 44<br />

Pates Hill Approved 7 110 33 163<br />

Tormywheel Approved 15 100 32 170<br />

Birnie Hill <strong>Wind</strong>farm Application 3 120 30 194<br />

Blacklaw <strong>Wind</strong>farm Extension Application 21 127 33 179<br />

Bracco Application 29 125 24 194<br />

Greengairs Application 9 125 22 206<br />

Hartwood Application 14 139 30 194<br />

Muirpark Application 11 127 16 102<br />

Standingfauld (<strong>for</strong>merly Greenbog) Application 8 100 21 355<br />

Burnhead (nr Stoneridge) Scoping 12 127 21 182<br />

Callendar Estates Scoping 10 125 15 198<br />

Craigannet Scoping 7 125 19 69<br />

Grangemouth Scoping 5 125 9 145<br />

Harburnhead Scoping ? ? 34 154<br />

November 2010 Chapter 13 Page 29<br />