<strong>Forthbank</strong> <strong>Wind</strong> <strong>Energy</strong> <strong>Development</strong><br />

13.4.57 The magnitude of these impacts is considered to be moderate on this site.<br />

Potential Operational Effects on Hydrogeology<br />

13.4.58 Should cast in-situ piles be required at the turbine locations, the piles may have localised ongoing<br />

impacts on the groundwater regime in the bedrock aquifer during the operation of the<br />

proposed wind energy development.<br />

13.4.59 During the operational phase of the proposed wind energy development, there will be<br />

considerably less on-site activity than during construction. As the underlying bedrock aquifer is<br />

dominated by fracture flow, the leaching of hydrocarbons, chemicals, trans<strong>for</strong>mer oils and fuel<br />

leaks from maintenance still present a potential source of contamination to the site. The low<br />

permeability superficial deposits on the site (Boulder Clay and Carse Clay) is expected to<br />

provide protection to the groundwater in the bedrock.<br />

13.4.60 The potential risk of pollution is substantially lower during the operational phase because of the<br />

decreased levels of activity. The majority of potential pollutants will have been removed when<br />

construction is complete; however, lubricants <strong>for</strong> turbine gearboxes, hydraulic oils and the<br />

potential <strong>for</strong> possible fuel leaks from maintenance vehicles will remain. Such impacts are<br />

considered to be of minor magnitude.<br />

Private Water Supplies<br />

13.4.61 There were no private water supplies identified by Clackmannanshire Council within 3km of the<br />

site. There<strong>for</strong>e the magnitude of the risk to private water supplies is negligible.<br />

Public Water Supplies<br />

13.4.62 There were no public water pipes identified by Scottish Water on the site. There<strong>for</strong>e the<br />

magnitude of the risk to public water supplies is negligible.<br />

Potential Operational Effects on Made Ground<br />

Landfill<br />

13.4.63 Placing foundations through landfill material may result in the stability of the turbines bases<br />

being impacted during the operational phase.<br />

13.4.64 The foundations in the landfill may be impacted by aggressive ground conditions, in particular<br />

the presence of landfill leachate. This may impact on the integrity of the turbine foundations.<br />

13.4.65 Accumulation of landfill gas may occur at the turbine foundations on the landfill site. Trenches<br />

<strong>for</strong> cabling may create preferential pathways <strong>for</strong> landfill gas migration. This could cause a risk<br />

of explosion at the site.<br />

November 2010 Chapter 13 Page 28<br />