<strong>Forthbank</strong> <strong>Wind</strong> <strong>Energy</strong> <strong>Development</strong><br />

• A907 immediately west of the Gartarry Roundabout;<br />

• Clackmannan Road (A907) immediately east of the Shillinghill Roundabout; and<br />

• Forth Crescent.<br />

7.3.9 The assessment has been limited to the above locations as this is the route that would<br />

experience the greatest increase in traffic flow as described above. It is accepted that smaller<br />

increases may occur on alterative routes which link with the A907. However, these increases<br />

are expected to be insignificant.<br />

Base Traffic Survey Data<br />

7.3.10 Baseline traffic survey data on the local road network was obtained by Streetwise Services<br />

Limited on behalf of RPS at the end of August 2010 during academic term time.<br />

7.3.11 7 day week, 24 hour traffic count data <strong>for</strong> the A907, Clackmannan Road (east of the Shillinghill<br />

Roundabout) and Forth Crescent was collected using automatic traffic count (ATC) equipment<br />

between 23 and 29 August 2010 (inclusive).<br />

7.3.12 2009 annual average daily traffic (AADT) flows on the A907 west of the Gartarry Roundabout<br />

was obtained from Clackmannanshire Council. Due to the wider current economic climate and<br />

the resultant impact on traffic growth, the 2009 flows are considered to be representative of<br />

current (2010) background traffic conditions.<br />

7.3.13 A summary of existing background traffic levels is presented below as Table 7.1.<br />

Table 7.1 Existing Background Traffic Flows (2010, two-way flows)<br />

Location 5 Day Average Flow (24 Hour) 7 Day Average Flow (24 Hour)<br />

A907 (west of Gartarry Roundabout) 15,353 14,413<br />

A907 (Clackmannan Road) 18,656 17,514<br />

Forth Crescent 692 594<br />

7.4 Assessment of Effects<br />

Road Infrastructure Requirements<br />

7.4.1 Assessments of the proposed road route to the proposed wind energy development site from<br />

the M876 Motorway have been undertaken by Entec and RPS. The assessments identified the<br />

requirements <strong>for</strong> infrastructure improvements along the length of the site access road at its<br />

junction with Bowhouse Road.<br />

7.4.2 The road infrastructure requirements along the site access road and the Bowhouse Road<br />

junction are set out below in Table 7.2.<br />

Table 7.2 Infrastructure Requirements – Site Access Road and Bowhouse Road Junction<br />

Issue<br />

Street Furniture<br />

Parking along roads on access route<br />

Access Road to site<br />

Junction of Bowhouse Rd and Access Road<br />

November 2010 Chapter 7 Page 5<br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> <strong>Development</strong> Co. Ltd 2010 ©<br />

Comment<br />

Street furniture may obstruct lorry movements<br />

Parked cars along route may obstruct lorry access<br />

Access road is not an adopted road<br />

Additional land is needed to negotiate junction<br />

Rein<strong>for</strong>cement of verge required