20.05.2014 Views

Forthbank Wind Energy Development - Partnerships for Renewables

Forthbank Wind Energy Development - Partnerships for Renewables

Forthbank Wind Energy Development - Partnerships for Renewables

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Forthbank</strong> <strong>Wind</strong> <strong>Energy</strong> <strong>Development</strong><br />

• changes to existing drainage patterns;<br />

• effects on baseflow;<br />

• effects on run-off rates and volumes;<br />

• effects on erosion and sedimentation;<br />

• effects on landfill leachate, groundwater and surface water quality;<br />

• effects on landfill leachate and groundwater levels;<br />

• effects on water resources (private and public water supplies, and fisheries);<br />

• effects on impediments to flow;<br />

• flood risk;<br />

• effects of coal mine workings on proposed development; and<br />

• effects on local geology.<br />

13.4 Assessment of Effects<br />

Potential Effects<br />

13.4.1 This section describes the potential effects on hydrology, geology and hydrogeology that could<br />

arise in the absence of mitigation during the following phases of the proposed wind energy<br />

development:<br />

• construction;<br />

• operation; and<br />

• de-commissioning.<br />

13.4.2 The assessment of effects has been carried out in a number of stages. Due to the nature of<br />

the site and the work to be undertaken, a number of effects will be similar <strong>for</strong> each phase of<br />

development.<br />

13.4.3 The first stage of the assessment details the various potential effects on the hydrological,<br />

geological and hydrogeological environment that may arise as a result of the proposed wind<br />

energy development, and assesses their potential magnitude.<br />

13.4.4 The second and final stage reassesses the significance of the potential residual effects<br />

following the implementation of proposed mitigation measures.<br />

November 2010 Chapter 13 Page 21<br />

Copyright <strong>Partnerships</strong> <strong>for</strong> <strong>Renewables</strong> <strong>Development</strong> Co. Ltd 2010 ©

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!