<strong>Forthbank</strong> <strong>Wind</strong> <strong>Energy</strong> <strong>Development</strong><br />

Viewpoint 15: Shieldhill<br />

Figure Number: CW-15a; CW – 15b<br />

Grid Reference NS 898 768 Elevation 175m AOD<br />

Bearing 358º Direction of View: north<br />

LCT: Lowland Plateaux LCA: Slamannan Plateau<br />

Distance to nearest<br />

Turbine:<br />

13.71km<br />

Assessed Magnitude of<br />

Change:<br />

negligible<br />

Cumulative effect with<br />

operating WF:<br />

Braes of Doune<br />

Craigengelt WF<br />

Earlsburn WF<br />

ASDA depot<br />

Cumulative effect with<br />

approved WF:<br />

Cumulative effect with Muirpark Cumulative effects: combined visibility<br />

application WF:<br />

successive visibility<br />

Cumulative Effects:<br />

When the receptor turns to the north the full layout of the Braes of Doune wind energy development is perceivable on<br />

the backdrop of the Knaik Hills. The viewpoint proves that, due to their large number, the 35 turbines could be visible<br />

at a distance of 38.3km.<br />

The Craigengelt layout of turbines is in the view when the receptor turns to the north east with the turbines rising<br />

above the skyline. Both wind energy developments are on a higher level position and easily detected by the eye which<br />

is drawn towards the Highlands.<br />

Some Earlsburn turbines would be visible next to Craigengelt’s turbines, the blades breaking the skyline.<br />

Eight turbines at Muirpark would be visible next to Craigengelt and in this angle of the view the Muirpark turbines stand<br />

beside, but at a closer distance, than Craigengelt.<br />

The ASDA’s single turbine would be in the direct view rising above the Falkirk-Denny Urban Fringe at a distance of<br />

5.2km. The turbine remains below the skyline and also below the Ochil Hill’s foothill which will not there<strong>for</strong>e <strong>for</strong>m a<br />

backcloth to the turbine.<br />

The proposed turbines remain far behind ASDA’s turbine in combined visibility.<br />

Magnitude of Cumulative Change: Medium<br />

Due to the long distance the Braes of Doune wind energy development is seen as a slight element in a wide landscape<br />

composition.<br />

Craigengelt <strong>for</strong>ms an evident skyline element but it does not <strong>for</strong>m the main visual focus of the view.<br />

The single ASDA turbine remains in the focus of the view.<br />

Due to the large number of turbines clearly visible in the landscape the magnitude of the visual effect is increased.<br />

Significance<br />

of Effect:<br />

Low - where the addition of the wind energy development will make a minor contribution to the<br />

overall cumulative situation, and its addition may be missed.<br />

Viewpoint 16: Dumyat Hill<br />

Figure Number: CW-16a; CW – 16b<br />

Grid Reference NS 836 977 Elevation 426m AOD<br />

Bearing 221º Direction of View: south east<br />

LCT: Lowland Hills LCU: Ochil Hills<br />

Distance to nearest<br />

proposed turbine:<br />

8.16km<br />

Assessed Magnitude of<br />

Change:<br />

LOW<br />

Cumulative effect with<br />

operating WF:<br />

Braes of Doune<br />

Craigengelt WF<br />

ASDA depot<br />

Cumulative effect with<br />

approved WF:<br />

Earlsburn North<br />

Cumulative effect with Muirpark Cumulative effects: combined visibility<br />

application WF:<br />

successive visibility<br />

Cumulative Effects:<br />

Earlsburn wind energy development turbine rises on the top of the Touch Hill ridge, breaking the skyline in the view to<br />

the west. The wind energy development is at the far range distance of 20.2km. Earlsburn North’s blades would be<br />

visible above the ridge against the skyline.<br />

Craigengelt’s turbines are hard to identify against the backcloth of the Fintry Hills due to the atmospheric conditions.<br />

The wind energy development is at a distance of 17.4km.<br />

Muirpark’s turbines would be visible next to the Craigengelt turbines while some would be staggered between the<br />

Craigengelt turbines.<br />

The layout of Braes of Doune’s turbines is clearly visible in the north.<br />

The ASDA depot single turbine would be difficult to distinguish from the Falkirk-Denny busy environment at the<br />

distance of 17km, there<strong>for</strong>e it will not add any visible effect to the view.<br />

Magnitude of Cumulative Change: Medium<br />

Due to the long distance the cumulative wind energy developments are seen as minor elements in the view.<br />

The high level position of these cumulative wind energy developments together with the high level of the viewpoint,<br />

brings the wind energy developments visually close to the higher level receptor and gives them more of a visual<br />

prominence in comparison with the <strong>Forthbank</strong> wind energy development which sits in a low river valley.<br />

Earlsburn wind energy development <strong>for</strong>ms an evident skyline element but it does not <strong>for</strong>m the main visual focus of the<br />

view.<br />

Slight potential increase in developed skyline in the view by Earlsburn North.<br />

Dumyat Hill af<strong>for</strong>ds almost 360 degree views to the surrounding landscape there<strong>for</strong>e the variety of directions of the<br />

views reduces the single value of the River Forth floodplain view to the south.<br />

Significance of<br />

Effect:<br />

Low - where the addition of the wind energy development will make a minor contribution to the<br />

overall cumulative situation, and its addition may be missed.<br />

November 2010 Chapter 9 Page 112<br />