b. Cast-in-place concrete applicable to TxDOT standard designs for storm drainage culverts<br />

and related structures, retaining walls, manholes, vaults, as well as bridges, shall be in<br />

accordance with the <strong>City</strong>’s technical specification 033105-Concrete Structures-Cast-in-<br />

Place (TxDOT). Otherwise, concrete for cast-in-place structures shall be in accordance<br />

with the <strong>City</strong>’s technical specification 033100-Concrete Structures Cast-in-Place (<strong>City</strong>);<br />

and<br />

c. Precast concrete applicable to precast pipes, TxDOT standard designs for storm drainage<br />

culverts and related structures, manholes, vaults, as well as bridges, shall be in<br />

accordance with the <strong>City</strong>’s technical specification 034105-Concrete Structures-Precast<br />

(TxDOT). Otherwise, concrete for precast structures shall be in accordance with the<br />

<strong>City</strong>’s technical specification 034100-Concrete Structures-Precast (<strong>City</strong>);<br />

17. Responsibility for maintenance <strong>of</strong> the structure shall be clearly noted on the plans. The plans<br />

shall clearly reference a structure maintenance plan and schedule. The maintenance plan shall<br />

clearly identify any drainage system required to relieve hydrostatic pressure on the structural<br />

system and ensure that it remains fully functional throughout the life <strong>of</strong> the structure; and<br />

18. Sight visibility triangles (where applicable).<br />

B. Retaining wall plans shall also include the following information:<br />

1. Plan view. The plan view shall include location <strong>of</strong> soil borings, surface and subsurface<br />

drainage structures and utilities that could be affected by wall construction.<br />

2. Elevation view. The elevation view shall include a pr<strong>of</strong>ile <strong>of</strong> the existing ground line along<br />

the wall alignment, proposed finished grade at face <strong>of</strong> wall, limits <strong>of</strong> wall payment (if<br />

applicable), top <strong>of</strong> wall pr<strong>of</strong>ile, soil boring log shown at the correct elevation and scale, wall<br />

rail if applicable, drainage structures and utilities as noted above. Unless noted otherwise and<br />

approved by the Director <strong>of</strong> <strong>Engineering</strong> Services, wall quantities shall be based upon the<br />

surface area <strong>of</strong> the wall from the top <strong>of</strong> wall to the bottom <strong>of</strong> wall. The bottom <strong>of</strong> wall is<br />

defined as the proposed finished grade at the face <strong>of</strong> the wall. The bottom <strong>of</strong> wall shall not be<br />

measured from the top <strong>of</strong> footing unless the top <strong>of</strong> footing is the proposed finished grade at<br />

the face <strong>of</strong> the wall.<br />

3. Estimated quantity table. Include the estimated quantity table for each retaining wall type.<br />

The table should contain the area <strong>of</strong> wall (for payment) and linear footage <strong>of</strong> railing (if<br />

applicable).<br />

4. Typical section. The typical section shall include a cross section with wall dimensions and<br />

showing the relationship <strong>of</strong> the wall to the roadway, property line, or controlling adjacency,<br />

control point(s) for horizontal and vertical alignment (typically the top outermost corner <strong>of</strong><br />

the wall), indication <strong>of</strong> maximum slope on top <strong>of</strong> and in front <strong>of</strong> the wall, location <strong>of</strong><br />

proposed finished grade, railing type, flume, and mow strip, etc. if applicable.<br />

5. General notes. The general notes shall include a note stating the required minimum<br />

embedment depth <strong>of</strong> the footing (minimum typically 1’), a note stating that the wall quantity<br />

shall be measured for payment between the top <strong>of</strong> wall and “x” ft. below finished grade,<br />

railing shop drawing requirements (if applicable), references to all standard sheets (if<br />

applicable) for pertinent information, and any other pertinent information regarding wall<br />

design and construction.<br />