29.06.2014 Views

City of Frisco Engineering Standards

City of Frisco Engineering Standards

City of Frisco Engineering Standards

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Standard Construction Details<br />

Table <strong>of</strong> Contents<br />

Detail No. Description Date<br />

GENERAL<br />

G01 Project Sign March 2012<br />

PAVING<br />

P01<br />

Thoroughfare Classes “A” Through “G” – Typical Section (with<br />

Moisture Conditioning) March 2012<br />

P02 Thoroughfare Classes “C” Through “G”, Alleys, Firelanes –<br />

Typical Section (without Moisture Conditioning) March 2012<br />

P03 Typical Pavement Reinforcement and Concrete Curb March 2012<br />

P04 Existing Concrete Pavement Widening March 2012<br />

P05 Concrete Pavement – Jointing Layout March 2012<br />

P06 Concrete Pavement – Construction Joints March 2012<br />

P07 Concrete Pavement – Expansion Joint March 2012<br />

P08 Concrete Street Headers March 2012<br />

P09 Monolithic Median Nose – Type 1 March 2012<br />

P10 Monolithic Median Nose – Type 2 March 2012<br />

P11 Median Nose with Pavers March 2012<br />

P12 Commercial Driveway Approach March 2012<br />

P13 Residential Driveway Approach with Vertical Sawcut March 2012<br />

P14 Residential Driveway Approach with Horizontal Sawcut March 2012<br />

P15 Alley Approach - RESERVED TBD<br />

P16 Alley Geometrics – Types “A” & “B”- RESERVED TBD<br />

P17 Alley Geometrics – Types “C” & “D”- RESERVED TBD<br />

P18 Alley Geometrics – Types “E” & “F” - RESERVED TBD<br />

P19 Alley Geometrics – Types “G” & “H”- RESERVED TBD<br />

P20 Alley Geometrics – Type “J” – RESERVED TBD<br />

P21 Speed Table March 2012<br />

P22 Reinforced Concrete Sidewalk March 2012<br />

P23 Directional Barrier Free Ramps – RESERVED TBD<br />

TRAFFIC<br />

T01 Pavement Markings and Markers – Sheet 1 <strong>of</strong> 3 March 2012<br />

T02 Pavement Markings and Markers – Sheet 2 <strong>of</strong> 3 March 2012<br />

T03 Pavement Markings and Markers – Sheet 3 <strong>of</strong> 3 – RESERVED TBD<br />

T04 Sign Post March 2012<br />

T05 Road Closed Barricade March 2012<br />

T06 Stop Signs and Stop Bars March 2012<br />

T07 Sign and Street Light Placement – RESERVED TBD<br />

T08 Street Name Blade March 2012<br />

DRAINAGE<br />

D01 Curbed Flume March 2012<br />

D02 Standard Curb Inlet – Sheet 1 <strong>of</strong> 2 March 2012<br />

D03 Standard Curb Inlet – Sheet 2 <strong>of</strong> 2 March 2012<br />

D04 Recessed Curb Inlet – Sheet 1 <strong>of</strong> 2 March 2012<br />

SD – Standard Details May 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!