29.06.2014 Views

City of Frisco Engineering Standards

City of Frisco Engineering Standards

City of Frisco Engineering Standards

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4.02 PAYMENT<br />

the revised quantity. If the adjustment is made by the <strong>City</strong>, the revised quantity will constitute<br />

the final quantity for which payment will be made.<br />

A. Refer to TxDOT Item 110.4 or as indicated in the Contract Documents.<br />

END OF SECTION<br />

<strong>City</strong> <strong>of</strong> <strong>Frisco</strong> May 2012<br />

Standard Technical Specification Excavation (Roadway) 312316-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!