F. All Work shall be done so as not to disturb roadways, adjacent structures, landscaped areas,<br />

or existing utilities. Any damage shall be immediately repaired to original or better condition<br />

and to the satisfaction <strong>of</strong> Engineer.<br />

3.02 INSTALLATION OF CARRIER PIPE<br />

A. Pipe Installation: Carrier pipe shall meet the requirements <strong>of</strong> the applicable Specification<br />

section. Remove all loose soil from casing. Grind smooth all rough welds at casing joints.<br />

Provide casing spacers, or insulators, or other approved devices, as required, to prevent<br />

flotation, movement, or damage to the pipe during installation and annular space grout<br />

placement. Every individual pipe section should be supported by spacers as shown in the<br />

<strong>City</strong>’s Standard Details. Carrier pipe shall be installed without sliding or dragging it on the<br />

ground or in the casing in a manner that could damage the pipe. Coat the casing spacer<br />

runners with a non-corrosive/environmentally safe lubricant to minimize friction when<br />

installing the carrier pipe.<br />

B. Testing <strong>of</strong> Carrier Pipe: Testing <strong>of</strong> the carrier pipe joints shall be completed prior to the<br />

filling <strong>of</strong> the annular space between the casing and carrier pipe with grout. Pressure testing<br />

shall be performed in accordance with the specification for the selected pipe material. Any<br />

leakage found during this inspection shall be corrected.<br />

C. Backfill Annular Space with Grout: After the installation <strong>of</strong> the carrier pipe, the annular<br />

space (all voids) between the casing and the carrier shall be filled with grout so all remaining<br />

surfaces <strong>of</strong> the exterior carrier pipe wall and casing interior are in contact with the grout.<br />

Furnish the necessary grout, equipment, hoses, valves, and fittings for the backfilling<br />

operation. Grout shall be pumped through a pipe or hose. Use grout pipes, or other<br />

appropriate materials to avoid damage to carrier pipe during grouting. The grout shall be<br />

proportioned to flow and to completely fill all voids between the carrier pipe and the casing.<br />

The Contractor shall provide end seals, as approved by the Engineer at each end <strong>of</strong> the casing<br />

to contain the grout backfill. The end seals shall be designed to withstand the anticipated<br />

grouting pressure and be watertight to prevent groundwater from entering the casing. Block<br />

the carrier pipe during grouting to prevent flotation during grout installation. The Contractor<br />

shall also protect and preserve the interior surfaces <strong>of</strong> the casing from damage. It is the<br />

responsibility <strong>of</strong> the Contractor to submit to the Engineer sufficient information indicating all<br />

proposed equipment, materials, and the method for filling this void.<br />

3.03 SAFETY<br />

A. The Contractor is responsible for safety on the job site. Perform all Work in accordance with<br />

the current applicable regulations <strong>of</strong> the Federal, State, and local agencies. In the event <strong>of</strong><br />

conflict, comply with the more restrictive applicable requirement.<br />

B. No gasoline powered equipment shall be permitted in jacking shafts and receiving shafts/pits.<br />

Diesel, electrical, hydraulic, and air powered equipment is acceptable, subject to applicable<br />

local, state, and federal regulations.<br />

C. Methods <strong>of</strong> construction shall be such as to ensure the safety <strong>of</strong> the Work, Contractor's and<br />

other employees on site, and the public.<br />

D. Furnish and operate a temporary ventilation system in accordance with applicable safety<br />

requirements when personnel are underground. Perform all required air and gas monitoring.<br />

<strong>City</strong> <strong>of</strong> <strong>Frisco</strong> May 2012<br />

Standard Technical Specification Trenchless Utility Installation 330523-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!