29.06.2014 Views

City of Frisco Engineering Standards

City of Frisco Engineering Standards

City of Frisco Engineering Standards

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

B. Refer to Public Works Construction <strong>Standards</strong>, NCTCOG, 4 th Edition, Item 107.19.3.6 for<br />

measurement <strong>of</strong> trench safety.<br />

4.02 PAYMENT<br />

A. Refer to Public Works Construction <strong>Standards</strong>, NCTCOG, 4 th Edition, Item 504.7 for<br />

payment <strong>of</strong> backfill.<br />

B. Refer to Public Works Construction <strong>Standards</strong>, NCTCOG, 4 th Edition, Item 107.19.3.6 for<br />

payment <strong>of</strong> trench safety.<br />

C. All excavation for utility installation shall be considered subsidiary to the utility bid item.<br />

No separate pay item for excavation, backfill and/or trenching, unless otherwise noted.<br />

END OF SECTION<br />

<strong>City</strong> <strong>of</strong> <strong>Frisco</strong> May 2012<br />

Standard Technical Specification Trenching, Backfilling and Compaction 330510-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!