PART 4 - MEASUREMENT AND PAYMENT<br />

4.01 MEASUREMENT<br />

A. The Lime Stabilized Subgrade shall be measured by the Square Yard (SY) complete in place<br />

and accepted for the thickness shown in the plans.<br />

B. The Lime shall be measured by the Ton (TN) complete in place.<br />

4.02 PAYMENT<br />

A. The Lime Stabilized Subgrade shall be paid for at the unit contract price and shall be total<br />

compensation for preparing the roadbed, for loosening, pulverizing, application <strong>of</strong> lime, water<br />

content in the slurry mixture and mixing water; mixing, shaping, sprinkling, compacting,<br />

finishing, curing and maintaining; for manipulations required; and for all labor, equipment,<br />

fuels, tool, and incidentals necessary to complete the work, all in accordance with the plans<br />

and specifications.<br />

B. The Lime material shall be paid for at the unit contract price bid for Lime which price shall<br />

be full compensation for furnishing the material; for all freight involved; for all unloading,<br />

storing and handling; and for all labor, equipment, fuels, tools, and incidentals necessary to<br />

complete the work.<br />

END OF SECTION<br />

<strong>City</strong> <strong>of</strong> <strong>Frisco</strong> May 2012<br />

Standard Technical Specification Lime Treatment 321113-8