29.06.2014 Views

City of Frisco Engineering Standards

City of Frisco Engineering Standards

City of Frisco Engineering Standards

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SECTION 015813<br />

PROJECT SIGN<br />

PART 1 - GENERAL<br />

1.01 DESCRIPTION<br />

A. All material, labor, equipment, tools and superintendence necessary to furnish, install, and<br />

maintain Project Sign.<br />

1.02 REFERENCES<br />

A. <strong>City</strong> <strong>of</strong> <strong>Frisco</strong> Standard Detail for Project Sign.<br />

PART 2 - PRODUCTS<br />

A. Contractor may contact Southwest Signs & Graphics, <strong>Frisco</strong>, Texas at (972) 335-0234 or<br />

other <strong>City</strong> approved manufacturer.<br />

PART 3 - EXECUTION<br />

3.01 INSTALLATION<br />

A. The Contractor shall coordinate with the <strong>City</strong> regarding the location prior to installation. The<br />

<strong>City</strong> shall provide on-site inspection <strong>of</strong> the installation.<br />

PART 4 - MEASUREMENT AND PAYMENT<br />

4.01 MEASUREMENT<br />

A. This Item will be measured on a per Each (EA) basis.<br />

4.02 PAYMENT<br />

A. All work performed and materials furnished in accordance with this Item and measured as<br />

provided under MEASUREMENT will be paid for at the unit bid price for “Project Sign” in<br />

accordance with the <strong>City</strong> <strong>of</strong> <strong>Frisco</strong>’s Standard Detail for Project Sign. This price is full<br />

compensation for all material, labor, equipment, tools and superintendence necessary to<br />

furnish and install Project Sign.<br />

END OF SECTION<br />

<strong>City</strong> <strong>of</strong> <strong>Frisco</strong> May 2012<br />

Standard Technical Specification Project Sign 015813-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!