29.06.2014 Views

City of Frisco Engineering Standards

City of Frisco Engineering Standards

City of Frisco Engineering Standards

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SECTION 024100<br />

GENERAL SITE PREPARATION<br />

PART 1 - GENERAL<br />

1.01 DESCRIPTION<br />

A. All materials, labor, equipment, tools and superintendence necessary for the preparation <strong>of</strong><br />

the project site not covered elsewhere in accordance with Public Works Construction<br />

<strong>Standards</strong>, NCTCOG, 4 th Edition, Item 203.<br />

B. This Section also includes:<br />

1.01 REFERENCES<br />

1. Protecting existing vegetation to remain.<br />

2. Removing existing vegetation.<br />

3. Clearing and grubbing<br />

4. Demolition<br />

5. Removal <strong>of</strong> all items within the limits <strong>of</strong> construction not specifically noted to remain.<br />

A. Public Works Construction <strong>Standards</strong>, NCTCOG, 4 th Edition, Items 203.1, 203.2, and 203.3<br />

1.02 PROJECT CONDITIONS<br />

A. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent<br />

occupied or used facilities during site-clearing operations.<br />

1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities<br />

without permission from <strong>City</strong> and authorities having jurisdiction.<br />

2. Provide alternate routes around closed or obstructed traffic ways if required by Owner<br />

or authorities having jurisdiction.<br />

B. Salvaged materials: Carefully remove items indicated to be salvaged and store as directed<br />

by the <strong>City</strong>.<br />

C. Utility Locator Service: Notify utility locator service for area where Project is located<br />

before site clearing.<br />

1. Call DigTESS at 1-800-344-8377<br />

2. Contact <strong>City</strong>’s ROW Division <strong>of</strong> Public Works at 972-292-5820 for locates<br />

D. Do not commence site clearing operations until temporary erosion and sedimentation control<br />

measures are in place.<br />

<strong>City</strong> <strong>of</strong> <strong>Frisco</strong> May 2012<br />

Standard Technical Specification General Site Preparation 024100-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!