29.06.2014 Views

City of Frisco Engineering Standards

City of Frisco Engineering Standards

City of Frisco Engineering Standards

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2. Prior to start <strong>of</strong> construction; confirm the static water pressure in writing to Owner. If<br />

static pressure differs from pressure shown on drawings, do not start work until notified<br />

to do so, in writing, by the Owner.<br />

1.04 REFERENCES: The following ASTM designations apply:<br />

A536 Ductile Iron Fittings<br />

D2241 Poly (Vinyl Chloride) (PVC) Plastic Pipe (SDR-PR)<br />

D2672 Bell-End Poly (Vinyl Chloride) (PVC) Pipe<br />

D2464 Poly (Vinyl Chloride) (PVC) Plastic Pipe Fittings, Threaded, Schedule 80<br />

D2466 Poly (Vinyl Chloride) (PVC) Plastic Pipe Fittings, Socket Type, Schedule 40<br />

D2467 Poly (Vinyl Chloride) (PVC) Plastic Pipe Fittings, Socket Type, Schedule 80<br />

D2564 Solvent Cements for Poly (Vinyl Chloride) (PVC) Plastic Pipe and Fittings<br />

D2287 Flexible Poly Vinyl Chloride (PVC) Plastic Pipe<br />

F656 Poly Vinyl Chloride (PVC) Solvent Weld Primer<br />

C213 AWWA Dual Compression Gasket Seal Fittings<br />

D2855 Making Solvent - Cemented Joints with Poly (Vinyl Chloride) (PVC) Pipe and<br />

Fittings<br />

F477 Ductile Iron Fitting Gaskets<br />

1.05 SUBMITTALS<br />

A. Product Data: Submit seven (7) copies <strong>of</strong> manufacturer's specifications and literature for all<br />

specified materials.<br />

B. Project Record Documents:<br />

1. Comply with Contract Documents and requirements.<br />

2. Locate by written dimension, routing <strong>of</strong> mainline piping, remote control valves and quick<br />

coupling valves. Locate mainlines by single dimensions from permanent site features<br />

provided they run parallel to these elements. Locate valves, intermediate electrical<br />

connections, and quick couplers by two dimensions at approximately 70 degrees to each<br />

other provided they are within 50 feet <strong>of</strong> a permanent site feature. Valves, electrical<br />

connections and quick couplers beyond 50 feet must be located by triangulation using<br />

three dimensions from building corners, walk intersections or similar junctures.<br />

3. When dimensioning is complete, transpose work to mylar reproducible tracings. Owner<br />

will provide tracings.<br />

4. Submit completed tracings prior to final acceptance. Mark tracings "Record Prints<br />

Showing Significant Changes". Date and sign plans.<br />

5. Provide three complete operation manuals and equipment brochures neatly bound in a<br />

hard back three-ring binder. Include any warranties and guarantees extended to the<br />

Contractor by the manufacturer <strong>of</strong> all equipment. Include seven (7) executed copies <strong>of</strong><br />

“Guarantee for Landscape Irrigation System”.<br />

<strong>City</strong> <strong>of</strong> <strong>Frisco</strong> May 2012<br />

Standard Technical Specification Irrigation System 328000-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!