29.06.2014 Views

City of Frisco Engineering Standards

City of Frisco Engineering Standards

City of Frisco Engineering Standards

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Engineering</strong> <strong>Standards</strong><br />

Table 3.1 – Pavement Design Inputs<br />

Thoroughfare Classification<br />

Input<br />

Type A Type B Type C Types D-G,<br />

Alley, Fire<br />

Lane<br />

Design Period 20 years 20 years 20 years 20 years<br />

Initial Serviceability 4.5 4.5 4.5 4.5<br />

Terminal Serviceability 2.5 2.3 2.3 2.0<br />

Concrete MOR @ 28 days 620 psi 620 psi 620 psi 620 psi<br />

Concrete E @ 28 days 5,000,000 psi 5,000,000 psi 5,000,000 psi 5,000,000 psi<br />

Modulus <strong>of</strong> Subgrade Reaction<br />

(Eagle Ford Shale Formation)<br />

300 psi/in 300 psi/in 300 psi/in 270 psi/in<br />

Modulus <strong>of</strong> Sugrade Reaction<br />

(Austin Chalk Formation)<br />

420 psi/in 420 psi/in 420 psi/in 420 psi/in<br />

Reliability 95% 92% 90% 85%<br />

Standard Deviation 0.35 0.35 0.35 0.35<br />

Load Transfer Coefficient 2.9 2.9 2.9 2.9<br />

Drainage Coefficient 1.0 1.0 1.0 1.0<br />

Design Average Daily Traffic<br />

(ADT) 60,000 30,000 20,000 12,000<br />

Traffic Growth Rate 3% 3% 3% 3%<br />

Percent Trucks 3% 3% 2% 2%<br />

Lanes 6 4 2 2<br />

Lane Distribution Factor 0.7 1 1 1<br />

I. Alley pavement thickness shall be 8”–5”–8” with pavement strength and reinforcement as shown<br />

in the Standard Details.<br />

J. Sidewalk thickness shall be as shown in Table 3.2.<br />

Table 3.2 – Sidewalk Thickness<br />

Sidewalk Width Thickness <strong>of</strong><br />

Reinforcing<br />

Concrete<br />

up to 6’ 4” #3 bars @ 18” o.c.e.w. or<br />

fiberglass mesh<br />

6’-1” to 7’-11” 5” #3 bars @ 18” o.c.e.w. or<br />

fiberglass mesh<br />

8’ or greater 6” #3 bars @ 18” o.c.e.w. or<br />

fiberglass mesh<br />

K. Fire lane paving shall be designed with the same design inputs as Types D-G streets.<br />

Section 3 – Pavement and Subgrade Design Requirements May 2012 Page 3-9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!