4.02 PAYMENT<br />

by the Contractor, the Contractor must obtain field measurements and calculations justifying<br />

the revised quantity. If the adjustment is made by the <strong>City</strong>, the revised quantity will constitute<br />

the final quantity which payment will be made.<br />

A. The work performed and materials furnished in accordance with this Item will be measured<br />

as provided for at the unit price bid for “EMBANKMENT” <strong>of</strong> the compaction method and<br />

type specified. The price is full compensation for furnishing embankment; hauling; placing,<br />

compacting, finishing, and reworking; disposal <strong>of</strong> waste material; and equipment, labor,<br />

tools, and incidentals.<br />

B. No separate pay for sprinkling, rolling (including pro<strong>of</strong> rolling).<br />

C. Correction <strong>of</strong> s<strong>of</strong>t spots in the subgrade will be at the Contractor's expense.<br />

END OF SECTION<br />

<strong>City</strong> <strong>of</strong> <strong>Frisco</strong> May 2012<br />

Standard Technical Specification Embankment 312413-2