29.06.2014 Views

City of Frisco Engineering Standards

City of Frisco Engineering Standards

City of Frisco Engineering Standards

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Engineering</strong> <strong>Standards</strong><br />

4.08 Design <strong>of</strong> Enclosed Storm Sewer System ............................................................... 4-19<br />

4.09 Detention/Retention Facility Design ....................................................................... 4-25<br />

4.10 Miscellaneous Drainage Requirements ................................................................... 4-28<br />

4.11 Open Channel Design .............................................................................................. 4-29<br />

4.12 Hydraulic Design <strong>of</strong> Culverts .................................................................................. 4-34<br />

4.13 Bridge Design Hydraulics ....................................................................................... 4-35<br />

4.14 Energy Dissipators .................................................................................................. 4-35<br />

4.15 Floodplain Alterations ............................................................................................. 4-36<br />

4.16 Erosion and Sedimentation Control ........................................................................ 4-38<br />

4.17 Drainage Easements ................................................................................................ 4-38<br />

4.18 Sustainable Development ........................................................................................ 4-38<br />

SECTION 5 UTILITY DESIGN REQUIREMENTS 5-1<br />

5.1 Water System-General .............................................................................................. 5-2<br />

5.1.1 Water Main Location................................................................................................. 5-2<br />

5.1.2 Horizontal and Vertical Alignment ........................................................................... 5-2<br />

5.1.3 Separation Distance between Water and Wastewater ............................................... 5-3<br />

5.1.4 Average Daily Water Demands ................................................................................. 5-3<br />

5.1.5 Water Main Sizing .................................................................................................... 5-4<br />

5.1.6 Water Main Materials ................................................................................................ 5-4<br />

5.1.7 Water Services ........................................................................................................... 5-5<br />

5.1.8 Valves ........................................................................................................................ 5-5<br />

5.1.9 Fire Hydrants ............................................................................................................. 5-6<br />

5.1.10 Connections to Existing Water Mains ....................................................................... 5-7<br />

5.1.11 Backflow Prevention ................................................................................................. 5-8<br />

5.1.12 Automatic Flushing Valve......................................................................................... 5-8<br />

5.2 Wastewater System-General ..................................................................................... 5-9<br />

5.2.1 Wastewater Main Location ....................................................................................... 5-9<br />

5.2.2 Horizontal and Vertical Alignment ........................................................................... 5-9<br />

5.2.3 Separation Distance between Wastewater and Water Mains .................................. 5-10<br />

5.2.4 Wastewater Flows ................................................................................................... 5-11<br />

5.2.5 Wastewater Main Sizing ......................................................................................... 5-11<br />

5.2.6 Wastewater Main Materials ..................................................................................... 5-12<br />

5.2.7 Wastewater Service Laterals ................................................................................... 5-12<br />

5.2.8 Manholes and Cleanouts ......................................................................................... 5-13<br />

5.2.9 Inverted Siphons ...................................................................................................... 5-14<br />

5.2.10 Wastewater Lift Stations ......................................................................................... 5-14<br />

5.2.11 Force Mains ............................................................................................................. 5-15<br />

5.2.12 Dumpster Enclosure Drains ..................................................................................... 5-15<br />

5.3 Reclaimed Water System-General .......................................................................... 5-16<br />

5.3.1 Reclaimed Water Main Location ............................................................................ 5-16<br />

5.3.2 Horizontal and Vertical Alignment ......................................................................... 5-16<br />

5.3.3 Separation Distance between Reclaimed Water and Other Systems ....................... 5-16<br />

5.3.4 Reclaimed Water System Materials ........................................................................ 5-16<br />

5.4 Easements ................................................................................................................ 5-17<br />

5.5 Thrust Restraint ....................................................................................................... 5-17<br />

5.6 Pavement Cut and Repair ........................................................................................ 5-18<br />

5.7 Trenchless Construction .......................................................................................... 5-18<br />

5.8 Crossings ................................................................................................................. 5-19<br />

5.9 Corrosion Protection................................................................................................ 5-20<br />

Table <strong>of</strong> Contents<br />

TC-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!