how the present rate of development could be<br />

accelerated.<br />

Renewable energy policy<br />

In July 2012, the White Paper on electricity market<br />

reform (EMR) was published. 4 The EMR shall ensure<br />

security of supply through the provision of a diverse<br />

range of energy sources, including renewable, nuclear,<br />

carbon capture and storage equipped plants, unabated<br />

gas and demand side management. It shall ensure<br />

sufficient investment in sustainable low carbon<br />

technologies and put the United Kingdom on a path to<br />

achieve its 2020 renewable energy targets (15 per cent)<br />

as well as its long-term targets to reduce carbon<br />

emissions by at least 80 per cent by 2050. 5 6<br />

The Renewables Obligation (RO) came into effect in<br />

2002 in England, Wales and Scotland and in 2005<br />

Northern Ireland. It places an obligation on the UK<br />

electricity suppliers to source an increasing proportion<br />

of electricity they supply to customers from renewable<br />

sources. Renewables Obligation Certificates (ROCs) are<br />

green certificates issued to operators of accredited<br />

renewable generating stations for the renewable<br />

electricity they generate. They are available for plants<br />

with a capacity over 50 kW except in Northern Ireland.<br />

ROCs can be traded and are used by suppliers to<br />

demonstrate that they have met their obligation. ROCs<br />

are due to be phased-out in 2027, a recent review of the<br />

ROC banding system proposed that hydro should, from<br />

2017 onwards, receive only half the ROC value per MWh<br />

than it enjoys at present.<br />

Legislation on small hydropower<br />

FITs were introduced to the United Kingdom, with the<br />

exception of Northern Ireland, in April 2010. They are<br />

available for renewable energy projects up to 5 MW<br />

capacity. As a result of the Government spending review<br />

from late 2010, the FIT system is being subjected to an<br />

early review. In January 2012 the DECC started a<br />

consultation about a revised FIT system, the results<br />

were recently announced with new tariffs applicable<br />

from April <strong>2013</strong>.<br />

Although the proposed <strong>2013</strong> tariffs for hydro (per kWh)<br />

are reasonable, as shown below, these are subject to<br />

whether degression as targets set by DECC are met,<br />

which is creating a rush for development and does not<br />

encourage sustainable growth of the industry: 7<br />

<br />

<br />

<br />

<br />

<br />

up to 15 kW: 21.65 p/kWh (US$0.334)<br />

15-100 kW: 20.10 p/kWh (US$0.310)<br />

100- 500 kW: 15.50 p/kWh (US$0.239)<br />

500-2,000 kW: 12.48 p/kWh (US$0.193)<br />

2,000-5,000 kW: 3.23 p/kWh (US$0.0498)<br />

Barriers to small hydropower development<br />

It is clear from the EU Water Framework Directive<br />

(WFD) what the permitting areas are, however little is<br />

clear or understood about the Directive on the<br />

Promotion of the Use of Energy from Renewable<br />

Sources (2009/28/EC and its subsequent amendments).<br />

It could be that WFD has a direct impact on whether a<br />

hydro scheme is to be developed or not, but the<br />

renewable energy sources Directive is theoretically a<br />

national target for renewable energy development and<br />

have very little impact on individual schemes. The<br />

Department for Food and Rural Affairs (DEFRA)<br />

administers the WFD in the UK. It is never clear if DEFRA<br />

and DECC consider the conflict between the two<br />

Directives with regard to hydropower development, or<br />

not. DECC is certainly involved in the development of<br />

guidance on water abstraction at the working-group<br />

level.<br />

Residual flow regulation exists in England and Wales<br />

(following the UK Environment Agency’s Good Practice<br />

Guidelines to the Hydropower Handbook, published in<br />

August 2009), with values varying from Q95 i to Q85. In<br />

Scotland the default residual flow is Q95, but each<br />

project must be reviewed individually. The Scottish<br />

Environmental Protection Agency (SEPA) published<br />

Guidance for Applicants on Supporting Information<br />

Requirements for Hydropower Applications in December<br />

2010. In Northern Ireland, the default residual flow<br />

value is Q95 but under certain categories of river and<br />

river protection, it can be Q80. The Northern Ireland<br />

Environment Agency published Guidance for Run-of-<br />

River Hydropower Schemes in Northern Ireland in July<br />

2011. The Environment Agency’s guidance is currently<br />

being reviewed to look at various flow options for<br />

hydropower and to include more details for high head<br />

applications.<br />

The major issue on the development of environmental<br />

guidance for hydro and the permitting process is the<br />

opposition to hydropower by a very strong angling lobby<br />

throughout the United Kingdom.<br />

Major issues which affect hydro developments are:<br />

Environmental concerns regarding e.g. fish<br />

passages.<br />

In England and Wales, there is a growing<br />

requirement for ‘splitting’ the flow above residual<br />

flow values between the hydro scheme and the<br />

river. This is being consulted on and reviewed by a<br />

working group comprising the Environment Agency<br />

and stakeholders (DECC, hydro and angling).<br />

Initially, no evidence for flow splitting is apparent.<br />

362