13.01.2015 Views

Surgil ESIA Report - Volume III - EKN

Surgil ESIA Report - Volume III - EKN

Surgil ESIA Report - Volume III - EKN

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

“O’ZLITINEFTGAZ” PC<br />

PFS “<strong>Surgil</strong> field complex costruction with valuable<br />

components retrieval”<br />

Thus, planned construction will bring into its certain contribution to improvement of<br />

social and economic conditions in the country.<br />

The nearest settlement is the Uchsay settlement located in 30km to the southeast<br />

from the field. In connection with insignificant emissions and good conditions of dispersion,<br />

there is not predicted additional impact on health of the working personnel. The personnel<br />

will be placed in camp with high level of comfort.<br />

Directly detrimental effect on the population is practically ruled out, in view of<br />

absence of residential areas in the considered territory.<br />

Construction of the new industrial projects, even small, gives new workplaces,<br />

improving social and economic condition of workers. The local population also is usually<br />

involved in work in sphere of service of the enterprise.<br />

It is necessary to add, that the realization of construction and additional gas and gas<br />

condensate extraction in the republican scale is one of the actions for creation of a stable<br />

raw-materials base for population and industry providing with gas fuel and oil products in<br />

the planned volumes.<br />

Realization of construction and the subsequent operation of designed constructions<br />

will cause some negative consequences: transfer of certain areas in temporary and constant<br />

use, risk of emergencies and the environmental contaminations connected with them.<br />

Planned design decisions inseparably linked with performance of a complex of<br />

actions for environmental protection on the essentially new scientific and technical bases of<br />

designing, construction and operation.<br />

Thus, the social and economic effect from project realization is obvious.<br />

<strong>Volume</strong> 2. Part 1. EIS Project for <strong>Surgil</strong> field construction<br />

31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!