OAJ “O’ZLITINEFTGAZ”<br />

ПТЭО «Комплексное обустройство<br />

месторождения Сургиль с извлечением ценных<br />

компонентов»<br />

The project provides sanitary sewer system (Figure 14). Domestic waste water by<br />

gravity comes into the sewer pumping station and pressure pipe are pumped to the<br />

biological treatment plant. Treated effluent pumping station is pumped to evaporation<br />

ponds.<br />

Network of sanitary sewer projects of ceramic sewer pipes. On the network<br />

established by manholes.<br />

Outside networks pressurized sanitary sewage from a residential village to the<br />

treatment plants are designed steel welded tubes is 2 km long with a reinforced anticorrosion<br />

insulation.<br />

According to the norms of water consumption in the residential village of<br />

firefighting:<br />

- Outer-5 l / sec.<br />

- Internal-15 l / sec.<br />

Enough water for firefighting is 216 m3. When applying for one conduit in the<br />

reservoirs of drinking-fire destination store additional fire reserve.<br />

Pumps, fire fighting purposes K100-65-200 (1 operating, 1 standby) water from<br />

reservoirs fed into the ring system plumbing. External firefighting is carried out fire<br />

hydrants installed on the ring network plumbing. Placement of fire hydrants shall ensure<br />

suppression of any point of buildings and structures of the two jets.<br />

Near the fire tanks are installed wet wells for direct intake of water mobile<br />

technology.<br />

The quality of water for fire suppression of specific requirements are not established.<br />

Design decisions include measures to minimize the water consumption for industrial<br />

purposes. At the site provides for a system of water recycling, resulting in savings of fresh<br />

water.<br />

4.5 WASTE EXPECTED DURING OPERATION<br />

Akchalak MCC large modern enterprise, during the operation which produced not only the<br />

waste gases emitted into the atmosphere, liquid, waste waters, and solid waste and some<br />

liquid to be storage and recycling or disposal.<br />

Practically at all objects of the main production generates solid and liquid wastes. Solid<br />

waste, mainly due to the use of various adsorbents and catalysts, which, as the generation to<br />

be replaced. Specific waste production are coke and pitch pyrolysis, Polymer Pyrolysis oil<br />

alkaline washing, various liquids consisting of organic solvents, dust from<br />

pylegazoulavlivayuschego equipment (ventilation systems of buildings and equipment,<br />

etc.).<br />

In the supporting manufacturing wastes are generated by replacing the filtration material<br />

condensate treatment plants and receiving demineralized water, replacing the adsorbent in<br />

the system of obtaining nitrogen and instrument air, at breaks packages or wrong with their<br />

treatment at the facility storage and packaging of polyethylene, for clarification of waste<br />