OAJ “O’ZLITINEFTGAZ”<br />

ПТЭО «Комплексное обустройство<br />

месторождения Сургиль с извлечением ценных<br />

компонентов»<br />

The feed water used for water supply to the water storage tanks. The input to the site<br />

provides water-metering unit with a bypass line.<br />

Water consumed in drinking needs disinfected bactericidal lamps, installed in the<br />

pumping station drinking-fire destination.<br />

In order to reduce the consumption of fresh water for fountains provide a pumping<br />

station to pump water recycling K100-80-160 Q = 100 m3/hr (1rab.; 1rez.).<br />

The project provides sanitary sewer system Treated effluent pumping station is<br />

pumped to evaporation ponds.<br />

Enough water for firefighting is 216 m3. When applying for one conduit in the<br />

reservoirs of drinking-fire destination store additional fire reserve.<br />

External firefighting is carried out fire hydrants installed on the ring network<br />

plumbing. Placement of fire hydrants shall ensure suppression of any point of buildings and<br />

structures of the two jets. Near the fire tanks are installed wet wells for direct intake of<br />

water mobile technology. The quality of water for fire suppression of specific requirements<br />

are not established.<br />

Design decisions include measures to minimize the water consumption for industrial<br />

purposes. At the site provides for a system of water recycling, resulting in savings of fresh<br />

water.<br />

In the construction of facilities of Water Resources will be withdrawn in the interim<br />

and long-term use plots of land resources, water management itself is designed for the<br />

removal and use of large volumes of water. Impact on the air is not significant.<br />

2.6 ELECTRICITY AND CP<br />

The main power supply area chemical complex (MCC) perform on their own source<br />

of power - gas engine power plant (the project company «Nexant»). This section describes<br />

the backup power supply gas and chemical complex.<br />

To ensure communication with the power project envisages construction of a<br />

complete two-transformer substation a block type.<br />

To implement the project back on the power grid network must perform the<br />

following amounts of power grid construction in Table 4.<br />