13.01.2015 Views

Surgil ESIA Report - Volume III - EKN

Surgil ESIA Report - Volume III - EKN

Surgil ESIA Report - Volume III - EKN

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

“O’ZLITINEFTGAZ” PC<br />

PFS “<strong>Surgil</strong> field complex costruction with valuable<br />

components retrieval”<br />

dead-end with overhead distribution of supply mains. There are accepted cast-iron radiators<br />

of МС-140-108 type as heaters.<br />

It is accepted electrical heating in premise for monoblock pump and pump house of<br />

household purpose. There are accepted electrical oil-filled radiators with manual<br />

temperature regulation of ERМPB-1.0/220 N=1.0kV type as heaters.<br />

There is provided supply-and-exhaust ventilation with mechanical and natural<br />

movement in the main premises of the designed buildings and constructions. Incoming air<br />

volume in premises is defined from provision of assimilation of heat-excesses, dissolution<br />

of harmful substances to permissible concentrations and observance of sanitary norms for<br />

fresh air.<br />

It is provided supply-and-exhaust ventilation with natural movement in the camp<br />

office building, premise for monoblock pump and pump house of household purpose. Free<br />

air intake is unorganized, through leakage of windows and doors. There is provided supplyand-exhaust<br />

ventilation both natural and mechanical movement in the dining room. Air<br />

exchange is calculated from condition of heat excesses assimilation from the process<br />

equipment in hot shop and by multiplication factors.<br />

There are installed window packaged air conditioners with air cooling of condenser<br />

in administrative premises, operator room, rest rooms for creation of comfortable conditions<br />

during the hot period of year.<br />

Thermal-transmission distance ≈ 941m.<br />

Automation<br />

Objects of the control and management for a zone of main purpose of <strong>Surgil</strong> CGTU are:<br />

- ILU;<br />

- LTS installation with turbo-expander;<br />

- DEG fire regeneration installation;<br />

- condensate separation and aeration installation;<br />

- pump house of condensate swapping;<br />

- condensate loading platform;<br />

- drainage tank for condensate;<br />

- technological pump house of condensate;<br />

- DEG warehouse;<br />

- condensate warehouse;<br />

- drainage tank for DEG;<br />

- drainage tank for condensate;<br />

- torch separator;<br />

- torch farm;<br />

<strong>Volume</strong> 2. Part 1. EIS Project for <strong>Surgil</strong> field construction<br />

63

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!