“O’ZLITINEFTGAZ” PC<br />

PFS “<strong>Surgil</strong> field complex costruction with valuable<br />

components retrieval”<br />

- flow string by 140mm diameter lower on design depth for the purpose of full<br />

opening of productive horizons with deepening on 20m lower and their<br />

development in stand of pipes.<br />

There are made special demands for design of gas wells. Wells should be airtight,<br />

durable, reliable in operation, inexpensive.<br />

Gas condensate wells are equipped by the special underground and ground<br />

equipment.<br />

Purpose of the underground equipment:<br />

- not to allow destruction of critical area of formation;<br />

- to protect flow strings and pump-compressor pipes and other equipment from<br />

corrosion and erosion;<br />

- to prevent formation of hydrate blocks in a borehole;<br />

- not to allow open well flowing by overlapping of gas stream on a bottomhole;<br />

- to provide supplying on a bottomhole and borehole of the corrosion inhibitors and<br />

hydrate inhibitors, and also a liquid mud during killing of well;<br />

- to provide work on increase of wells productivity;<br />

- to lower inundation rate and to isolate watering interlayers;<br />

- to provide liquid and firm particles removal from the bottomhole;<br />

- to provide possibility of carrying out research and repair works.<br />

The land equipment is intended for:<br />

- hermetic sealing of hole annulus of well;<br />

- regulations and control of gas streams;<br />

- regulations of well rate of yield and maintenance of the operation set mode;<br />

- start-up, shutdown and killing of well;<br />

- supply of the corrosion inhibitors and hydrate inhibitors on bottomhole and in<br />

borehole;<br />

- control of wellhead pressure and temperature;<br />

- carrying out research and repair works, including works on increase of wells<br />

productivity.<br />

There is install the casing head ОКК-2-350-299-214-140 type on the wellhead which<br />

binding and sealing all well strings. Wellhead is equipped with control equipment (casing<br />

head and Christmas tree) of cross-shaped type AFK 3-65х350 for 350 atmospheres which<br />

binding and sealing tube and tubing space of the well flow string.<br />

Connections of assembly of control equipment are flange. The control equipment is<br />

completed by straight-through type slide valves with consolidation “metal to metal” with<br />

positive or automatic greasing feed.<br />

<strong>Volume</strong> 2. Part 1. EIS Project for <strong>Surgil</strong> field construction<br />

39

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!