OAJ “O’ZLITINEFTGAZ”<br />

ПТЭО «Комплексное обустройство<br />

месторождения Сургиль с извлечением ценных<br />

компонентов»<br />

sewage is discharged into a separate sewer system, subject to Bioremediation and too<br />

pumped to evaporation ponds.<br />

Protection of land resources<br />

Problem of land are similar to those considered in Part 1 of "Construction of GCM<br />

<strong>Surgil</strong>.<br />

Reclamation of land included in the total complex of works on the construction of<br />

pipelines and in the following order:<br />

- Removal of topsoil and moving it to a temporary dump.<br />

- Pipeline construction (excavation, isolation-laying work, etc.)<br />

- The distribution of excess mineral soil remaining after backfilling of trenches, the<br />

band re-cultivation.<br />

- Cleaning of debris.<br />

- The reverse movement of the temporary dumping CAP and its uniform distribution<br />

within the zone of reclamation.<br />

- Planting grass.<br />

When removing, transporting and storage of topsoil should take measures to avoid<br />

deterioration of its quality.<br />

Between production work near existing pipelines, CFS, or at the intersection with<br />

presence of representatives of operating companies.<br />

After the passage of isolation-productive packing columns, packed in a pipeline<br />

trench to sleep, moving the entire mineral soil from the Blade on a strip of fertile layer of<br />

soil removed by bulldozers.<br />

After the end of works on construction of pipeline construction on the entire band<br />

performed the following work:<br />

- Backfilling and tamping a fiber or leveling ruts and holes that have arisen as a result<br />

of construction works;<br />

- Cleaning of debris;<br />

- Removal of soil contamination in the ground fuel and other materials that would<br />

impair the soil.<br />

The flora of the pipeline route after remediation is easily restored, and the animals<br />

experience during construction of the disturbance factor, after the completion of the return<br />

to former habitats. Since virtually all gas pipelines laid underground, there will be no<br />

obstacles to the migration of animals.<br />

Upon completion of unimproved land rekultiviruyutsya are subject to improvement<br />

and gardening.<br />

Книга 2. Часть 2. Проект ЗВОС по строительству ГХК<br />

79