OAJ “O’ZLITINEFTGAZ”<br />

ПТЭО «Комплексное обустройство<br />

месторождения Сургиль с извлечением ценных<br />

компонентов»<br />

Solid Waste<br />

In the operation of MCC Akachalak will be generated solid wastes, which are described in<br />

chapter 4.5. In the process of building forms a certain number (from 1 to 10%) of<br />

construction waste.<br />

Necessary solid waste landfill unit that will minimize negative impacts on the environment.<br />

Automation and control systems, communications<br />

Information management system of technological processes is divided into three levels:<br />

supervisory control of the complex as a whole, the level of operational management of<br />

production by the gas processing and transportation of gas, the level of automatic and<br />

remote control of technological installations. Event for automation and control systems,<br />

communications technology are the key to reducing accidents, and the fastest disaster<br />

recovery, if they nevertheless occur.<br />

Fire preventive measures<br />

Fire prevention measures are developed in compliance with the rules and regulations.<br />

All of the designed buildings and II degree of fire resistance to the categories of explosive<br />

fire. In the design took into account the requirements for the required number of emergency<br />

exits, and avoid crossing busy freight flows. In the case of an explosion in hazardous<br />

locations provided legkosbrasyvaemye design. These can be either a cover or window<br />

openings. The premises or facilities categories: A, B, provided iskronedayuschie floors.<br />

To respond quickly to emergencies at the site of a complex of buildings of firefighting<br />

purposes:<br />

- DHW pump stations, industrial and fire-fighting purposes;<br />

- Tanks of fire-fighting water reserve;<br />

- Pumping station automatic fire;<br />

- Tanks of water for automatic fire.<br />

To reduce fire hazards in the production of the project includes the following<br />

activities:<br />

- All valves and safety valves and adopted by a class of leak closure;<br />

- Explosive detectors installed indoor gas concentrations;<br />

- Electrical equipment in the fire-hazardous areas and outdoor areas are projected<br />

explosion-proof;<br />

- Technological pipelines are laid underground or on noncombustible supports;<br />

- Explosive and flammable substances are removed from the room ventilation<br />

system;<br />

- To reduce accidental emissions equipment, fittings and piping are designed to<br />

pressure exceeding the maximum operating pressure;<br />

Книга 2. Часть 2. Проект ЗВОС по строительству ГХК<br />

80

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!