“O’ZLITINEFTGAZ” PC<br />

PFS “<strong>Surgil</strong> field complex costruction with valuable<br />

components retrieval”<br />

CONCLUSION<br />

Ecological estimation of impact of designed production was spent on the basis of the<br />

analysis of existing condition and characteristics of environment in the region of planned activity.<br />

There are analyzed variants of realization of principal design decisions in work, and are<br />

revealed and characterized possible sources of impact, type and character of impact, and also<br />

objects of impact from the ecological point of view.<br />

There is made the forecast of possible impact of construction objects on the condition of<br />

mineral resources, atmosphere, soils, surface reservoirs, flora and fauna, and also on the<br />

maintenance stuff.<br />

There are considered the social and economic aspects connected with construction and<br />

operation of designed constructions.<br />

There are described objectively existing dangers for maintenance stuff, and for environment<br />

in section of possible emergencies origin, and is drawn a parallel of designed production with the<br />

similar enterprises operating over a long period of time, and also are planned measures for<br />

prevention emergency situations and possible adverse impacts on environment.<br />

As a result of the done work it is possible to draw following conclusions:<br />

- project realization is directed to support stability in supply of the country by gas<br />

and polyethylene combinations;<br />

- the project purpose is the increase of hydrocarbons extraction and deeper tank gas<br />

drying without considerable anthropogenic load increment on the environment;<br />

- in the social plan project realization will allow to create additional workplaces, to<br />

create comfortable conditions for maintenance stuff;<br />

- risk of emergencies origin with considerable consequences is low, as well as at<br />

nearby similar manufactures.<br />

Realization of planned activity at observance of technological discipline, safety engineering,<br />

and realization of nature conservation measures cannot affect environment with long-term harmful<br />

consequences, therefore, it is recommended to continue designing of object taking into account<br />

results of this work.<br />

<strong>Volume</strong> 2. Part 1. EIS Project for <strong>Surgil</strong> field construction<br />

113

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!