“O’ZLITINEFTGAZ” PC<br />

PFS “<strong>Surgil</strong> field complex costruction with valuable<br />

components retrieval”<br />

Length is 108km.<br />

On all loops at the distance of 14-15m from wellhead there are arranged “П” shaped<br />

compensators for thermal-changes compensation of laid length. Loops are laid into ground<br />

with deepening 1m to the top of forming pipe and covered by anticorrosive isolation.<br />

At this stage, the land resources (temporary and constant allotment of lands under<br />

construction), atmospheric air - from burning of technologically necessary emissions on<br />

wells flares are the objects of impact. Underground waters will not undergo specific<br />

changes.<br />

2.5 GAS GATHERING STATIONS (GGS) AND COLLECTORS PROJECT<br />

By all variants of PFS there are provided gas gathering stations in number of three<br />

pieces. Difference by variants is the quantity of input loops to gas gathering stations. There<br />

is also provided incoming-line unit for seven wells and three collectors from gas gathering<br />

stations in the CGTU area by all variants.<br />

GGS-1. 2 and 3 (figure 3 and 4) are consists of following constructions:<br />

- incoming-line unit (GS);<br />

- platform for torch farm;<br />

- drainage tank for torch farm.<br />

There is provided on GGS:<br />

- purging of loops on torch;<br />

- protection of loops from pressure excess.<br />

The incoming on GS of GGS loops from wells are equipped by safety valves for<br />

protection of loops from pressure excess (safety valves of Drain Safety Spring Valve type<br />

through T-valve are binding on a torch). By means of tap valves each loop is binding on a<br />

torch for purge execution during liquid gathering. Besides, there are installed disconnecting<br />

tap valves, adjustable choke, and float valve on a loop.<br />

GGS territory is fenced; the torch platform also has the fence and is taken out on<br />

100m.<br />

Preliminary hydraulic calculation of connecting collectors of GGS – <strong>Surgil</strong> CGTU is<br />

executed for productivity 2.518·10 6 m3/days. Maximum collector length is 3.8km. Gas<br />

pressure and temperature in the beginning of collector make 7.8MPa and 45 0 С relatively.<br />

<strong>Volume</strong> 2. Part 1. EIS Project for <strong>Surgil</strong> field construction<br />

42

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!