“O’ZLITINEFTGAZ” PC<br />

PFS “<strong>Surgil</strong> field complex costruction with valuable<br />

components retrieval”<br />

3 ALTERNATIVE DECISIONS ANALYSIS<br />

There is provided in the performance specification for development of “<strong>Surgil</strong> field<br />

complex construction with valuable components retrieval” PFS, in section I “<strong>Surgil</strong> field<br />

construction”:<br />

I variant<br />

II variant<br />

- gas production, treatment and transport in volume of 2.0х10 9 m 3 per<br />

year, gas condensate recovery, treatment and transport in volume of 100<br />

thousand tons per year.<br />

- gas production, treatment and transport in volume of 3.0х10 9 m 3 per<br />

year, gas condensate recovery, treatment and transport in volume of 140<br />

thousand tons per year.<br />

Both variants assume to carry out wells production gathering and gas preparation on<br />

the gas complex treatment plant (CGTU) located on the field area. Dry gas and allocated<br />

condensate during gas treatment to supply to the gas and chemical complex (GCC) located<br />

in Akchalak settlement or the Kungrad town.<br />

There are considered two variants of the location GCC in section II of “Gas and<br />

chemical complex construction” project: in the region of Akchalak settlement and in the<br />

region of Kungrad town (Ravshan). Therefore, there are allocated sub-variants of the<br />

finished goods transport:<br />

Iа variant<br />

Ib variant<br />

IIа variant<br />

IIb variant<br />

- GCC capacity for raw gas processing in volume of 2.0х10 9 m 3 per year<br />

with location in the region of Akchalak settlement;<br />

- GCC capacity for raw gas processing in volume of 2.0х10 9 m 3 per year<br />

with location in the region of Kungrad city;<br />

- GCC capacity for raw gas processing in volume of 3.0х10 9 m 3 per year<br />

with location in the region of Akchalak settlement;<br />

- GCC capacity for raw gas processing in volume of 3.0х10 9 m 3 per year<br />

with location in the region of Kungrad city.<br />

There is presented the schematic diagram of <strong>Surgil</strong> CGTU finished goods transport<br />

by variants in the figure 7.<br />

Variants analysis shows that the variant IIа have maximum advantages with<br />

extraction of 3 billion and GCC location in Akchalak settlement (nearness of the railway<br />

and oil loading rack, highways, TL, main gas pipeline, water conduit and others).<br />

Main purpose of planned activity is fuller use of valuable components containing in<br />

natural gas of <strong>Surgil</strong> field: ethane, propane-butane fraction, gas condensate, and deeper tank<br />

gas dewatering.<br />

Rational and full retrieval of ethane, propane-butane fraction and gas condensate<br />

from natural gas provides output expansion of polyethylene and liquid hydrocarbons on<br />

GCC.<br />

<strong>Volume</strong> 2. Part 1. EIS Project for <strong>Surgil</strong> field construction<br />