OAJ “O’ZLITINEFTGAZ”<br />

ПТЭО «Комплексное обустройство<br />

месторождения Сургиль с извлечением ценных<br />

компонентов»<br />

torches of pyrolysis furnaces, boilers and other consumers, ensuring the normal operation of<br />

the complex. External gas supply is used only briefly at start-up work or in emergency<br />

situations. For emergency cases, complete cessation of the cooling water, full of power<br />

failure, stop the flow of quenching water, the compressor of pyrolysis gas, ethylene and<br />

propane refrigeration units for the launch complex, and also for the neutralization of<br />

discharges from relief valves in excess of operating pressures is designed flare system<br />

management where they will be burned and scattered by the combustion products as needed,<br />

however, APC is working all the time - 8760 hours per year in the mode of emergency<br />

preparedness and volley discharges.<br />

All the basic production cycle includes the following processes:<br />

- Methane, drying it, and transport to the COP Akchalak MG Hiva Beyneu;<br />

- Obtaining of ethane, propane, butane, light condensate;<br />

- Ethylene (saturation of ethane pyrolysis, training, removal of hydrocarbons from<br />

process water, compressed Pyrolysis, Pyrolysis drying, cooling down and removal of<br />

methane, acetylene removal, fractionation of ethylene);<br />

- Obtaining polyethylene (training materials, reactor and adsorption stage, the<br />

separation of the polymer, extrusion, granulation, dehydration, stripped solvent, mixing,<br />

classification, storage and distillation).<br />

Auxiliary production and offsite facilities include:<br />

- Installation of butene-1;<br />

- Installation of the oxidation of spent caustic;<br />

- Manufacture of steam;<br />

- Fuel system;<br />

- Torchlight economy;<br />

- To provide nitrogen and instrument air;<br />

- Installation of waste oil;<br />

- Storage of intermediate and final products;<br />

- Packaging line and production of polyethylene film;<br />

- A system of source water;<br />

- A system of boiler feed water;<br />

- A system of cooling water;<br />

- Fire water system;<br />

- Installation of sewage treatment;<br />

- Provision of electricity;<br />

- Infrastructure.<br />

Книга 2. Часть 2. Проект ЗВОС по строительству ГХК<br />

27