“O’ZLITINEFTGAZ” PC<br />

PFS “<strong>Surgil</strong> field complex costruction with valuable<br />

components retrieval”<br />

Heating and ventilation<br />

Heat supply of buildings and constructions of <strong>Surgil</strong> CGTU is provides from<br />

designed own boiler house.<br />

Table 13 - Heat consumption<br />

Rated conditions<br />

Maximumwinter<br />

condition<br />

Condition of<br />

coldest month<br />

Summer<br />

condition<br />

Heat productivity of boiler house mw (gcal/h)<br />

Heat<br />

consumption<br />

for heating and<br />

ventilation<br />

Heat<br />

consumption<br />

for hot water<br />

supply<br />

Heat<br />

consumption<br />

for<br />

technological<br />

needs<br />

0.349<br />

(0.301)<br />

0.349<br />

(0.301)<br />

Total<br />

heat<br />

consumpt<br />

ion<br />

0.0883<br />

0.4373<br />

-<br />

(0.076)<br />

(0.377)<br />

0.0574<br />

0.4064<br />

-<br />

(0.0494)<br />

(0.3504)<br />

- - - -<br />

Installed<br />

capacity<br />

E/m.kW<br />

11.2<br />

Taking into account losses (K=1.1) total heat requirement will make<br />

QTOTAL=0.3770 gcal/hх1.1 = 0.41gcal/h.<br />

Proceeding from the above-stated heat loads, there is accepted for installation the<br />

modular transportable automated boiler house KBТА – 0.5 GН with two hot-water boilers<br />

by capacity 0.25 MW each. Total installed capacity of the boiler house will make<br />

0.43gcal/h.<br />

Hot water with parameters T=95-70°C serves as heat carrier for heating and<br />

ventilation systems.<br />

There is accepted tank V=5m3 for water reserve. There is provided raw water<br />

softening in water preparation installations on constant magnets UVPM-1.<br />

As fuel for boilers is accepted natural gas of low pressure. Gas supplied from fuel gas<br />

reduction assembly of <strong>Surgil</strong> CGTU. Gas hourly consumption for boiler house<br />

ВН=56m3/h. Annual consumption is equal ВН=234534m 3 .<br />

As source of heat supply of camp buildings and constructions serve individual gas<br />

heating water-heating modules of “VITOPEND-100” type, provided with the built-in<br />

circulating pumps and heating gas devices of АОGV type. The heat-carrier - water with<br />

parameters Т=95-70°С.<br />

Heating systems of CGTU buildings and constructions are accepted horizontal flow<br />

with passing movement of the heat carrier. There are accepted cast-iron radiators of МС-<br />

140-108 type and registers from smooth pipes as heaters.<br />

Heating systems of camp office building and dining room are double-piped deadended<br />

with overhead distribution of supply mains. Heating system of hostel is single-pipe<br />

<strong>Volume</strong> 2. Part 1. EIS Project for <strong>Surgil</strong> field construction<br />