“O’ZLITINEFTGAZ”<br />
open joint-stock company<br />
FS «Complex development of <strong>Surgil</strong> field<br />
with extracting of valuable components»<br />
CONCLUSION<br />
Feasibility study of the Project as for UGCC has been carried out by CMAI (Singapore)<br />
concerning marketing research together with «SAMSUNG ENGINEERING» and «HYUNDAI<br />
ENGINEERING» (Republic of Korea) concerning process technology and all-factory equipment. This<br />
process technology provides for gas and condensate processing with extracting of valuable<br />
components such as: HDPE, PP, sales gas.<br />
Based on the data provided DEI research was performed taking into account the State<br />
environmental expertise requirements made during DEI project examination.<br />
Results of hydrological and geological engineering survey of UGCC construction area have been<br />
studied thoroughly. In hydrogeological respect the area in question is arid. Ground waters occur at the<br />
depth of over 25.0m, they are strongly mineralized and unsuitable as potable or service water.<br />
Conducted geological engineering survey indicates the necessity of EGE-1 soils removal due to its<br />
macroporosity, subsiding and deformability. EGE-2 soils are also recommended for removal due to their<br />
physical-mechanical properties particularly unevenness of limestones spreading and thickness as well<br />
as marlaceous and argillaceous deposits dilatation. As the foundation soils EGE-3 soils are<br />
recommended for use and EGE-1 and EGE-2 soils are recommended to be changed for artificial soil<br />
and making impervious cushion of loamy soils by compacting.<br />
Domestic waste waters are to be purified at the treatment facilities. Normative clean waters are to<br />
be discharged to the ponds consisting of 5 maps with total area of 12ha for vaporizing.<br />
Method of purified process waste waters disposal to the Out Side Fence Limit of UGCC has not<br />
been worked out yet. Several ways of disposal are being considered:<br />
• utilization for irrigation;<br />
• utilization for bio-ponds;<br />
• filling of depressions or abandoned open cast;<br />
• filling of ponds for vaporizing.<br />
Analysis of degree of the air pollution with total emissions from UGCC and Akchalak CS has<br />
shown that in the area of design UGCC dwelling settlement and existing Akchalak settlement location<br />
maximum concentrations of contaminants in surface layer of the atmosphere will not exceed<br />
established MPCs.<br />
UGCC project implementation will undoubtedly negatively affect environmental complexes being<br />
close to it. In this respect all the technological decisions are to be directed to prevent those negative<br />
effects or minimize them as much as possible. On-site and off-site emissions sources will be equipped<br />
with appropriate analyzers to detect and control contaminants in the atmosphere. Carrying-out of<br />
monitoring will be based on the specially designed program specifying supervision network<br />
arrangement particularities, sampling periodicity, list of components to be control, character of route<br />
supervision as well as the content of reports with a glance at the technological peculiarities of the<br />
Project and relating estimated degree of influence upon the natural environment components.<br />
Book 5. Declaration of environmental impact concerning UGCC construction<br />
42