13.01.2015 Views

Surgil ESIA Report - Volume III - EKN

Surgil ESIA Report - Volume III - EKN

Surgil ESIA Report - Volume III - EKN

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

“Management of Ustyurt GCC infrastructure objects<br />

and <strong>Surgil</strong> GCF construction” UE »<br />

3. FIELD OF APPLICATION<br />

3.1. This Management Procedure establish uniform rules and order of carrying out of the technotechnological<br />

measures package directed to prevention of environmental pollution by the wastes,<br />

generated during drilling of production wells in <strong>Surgil</strong> field with use of drilling mud recommended<br />

by the Group working draft.<br />

3.2. This Management Procedure cover drilling cuttings neutralization and disposal (waste drilling<br />

mud plus drilling rock) and drilling sewage waters formed during wells drilling immediately in cuttings<br />

storage barns installed in the drilling rigs areas according to Group working draft for production<br />

wells construction in <strong>Surgil</strong> field.<br />

3.3. Cuttings storage barns used for temporary storage of drilling rock and waste drilling mud are a<br />

part of the drilling rig area developed scheme<br />

3.4. According to given by the customer project of wells design, formed on all wells of <strong>Surgil</strong> field<br />

drilling cuttings amount will make 29.7 thousand cubic meters, including 12.9 thousand cubic meters<br />

of drilling rock and 16.8 thousand cubic meters of WDM. Amount of formed DSW will make<br />

33.5 thousand cubic meters. Formed drilling cuttings amount calculations are resulted in Appendix<br />

2.<br />

3.5. Management Procedure is intended for industrial-engineering services of environmental protection<br />

of “Ustyurtgaz” USE.<br />

- 5 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!