13.01.2015 Views

Surgil ESIA Report - Volume III - EKN

Surgil ESIA Report - Volume III - EKN

Surgil ESIA Report - Volume III - EKN

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

OAJ “O’ZLITINEFTGAZ”<br />

ПТЭО «Комплексное обустройство<br />

месторождения Сургиль с извлечением ценных<br />

компонентов»<br />

Source of heat designed public buildings inhabited settlement MCC is its own<br />

projected boiler.<br />

Таблица 5 - Теплопроизводительность котельной жилого поселка<br />

Calculated<br />

Mode<br />

Теплопроизводительность котельной МВт (Гкал/час)<br />

Consumption<br />

heat for<br />

heating and<br />

ventilation<br />

Maximum winter mode 1,1456<br />

(0,9876)<br />

Heat<br />

consumption for<br />

hot water<br />

0,6644<br />

(0,5727)<br />

Consumptin<br />

heat<br />

technologial<br />

cal<br />

needs<br />

Total<br />

consumpt<br />

ion<br />

Heat<br />

- 1,81<br />

(1,5603)<br />

establishe<br />

d.<br />

Power<br />

e / gB.<br />

kW<br />

Mostcoldest<br />

month<br />

0,6874<br />

(0,5926)<br />

0,6644<br />

(0,5727)<br />

- 1,3518<br />

(1,1653)<br />

40,0<br />

Summer mode - 0,6644<br />

(0,5727)<br />

- 0,6644<br />

(0,5727)<br />

Based on the aforementioned heat loads, the boiler installation approved<br />

transportable automated block with four boilers. The total installed capacity of the boiler<br />

room will be 1.72 Gcal / hour. Manufactured modular boiler - Scientific-Production<br />

Enterprise "Ista", Tashkent, Uzbekistan.<br />

Coolant for heating and ventilation systems used hot water with a temperature of 95-<br />

70 C, the needs of hot water - water at 65 C, which is prepared in the reservoir water<br />

heaters.<br />

Softening of raw water provided to water treatment devices with permanent magnets<br />

UVPM-1.<br />

Fuel for boilers adopted by natural gas at low pressure. Fuel gas is supplied to the<br />

timing of paragraph (EMG), which is located near the village. Akchalak.<br />

All the gas flow on the boiler room 225 m3/hr. Annual consumption is equal to<br />

400,419.8 m 3 / year<br />

As the heaters in public buildings made aluminum radiators and registers of the<br />

smooth tubes.<br />

Heating system and two-story single-story single-family homes on their own<br />

individual heat sources. As the heating elements made of cast iron radiators.<br />

In the main areas of projected public buildings and facilities provided for supply and<br />

exhaust ventilation with a mechanical drive and natural. To create a comfortable<br />

environment during the hot season in the administrative offices, rest rooms installed for<br />

household air conditioners.<br />

Ventilation of residential natural. The influx of unorganized through leaks of doors<br />

and windows, extractor channel.<br />

Книга 2. Часть 2. Проект ЗВОС по строительству ГХК<br />

50

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!