“Management of Ustyurt GCC infrastructure objects<br />

and <strong>Surgil</strong> GCF construction” UE »<br />

8.10. Therefore, for the purpose of the further insulation of the upper layer in cuttings storage barn<br />

there is applied screen from clay by thickness of 0.3m on the processed after neutralization/hardening<br />

layer with use of heavy technics (for example, bulldozer T-170). Clay filling and its<br />

lay-out are made from the barn base side where excavation of hollows has not been carried out during<br />

previous operation.<br />

8.11. At the expense of bulldozer weight (22 tons) there is occur squeezing-out of the liquid phase<br />

sheet located between non-fluid, semi-hard layer of drilling cuttings and hard phase of drilling rock,<br />

towards the hollows prepared before it. This operation is resulted schematically in figure 8.3.<br />

8.12. During accumulation of liquid phase in these hollows, there is executed its treatment according<br />

to the above-stated operations. After the liquid phase will be completely squeezed-out and clarified,<br />

there is carried out alignment of insulating layer by corresponding road technics. Required cal<br />

quantity for each operation is calculated below. Duration of this operation is till 5 days.<br />