13.01.2015 Views

Surgil ESIA Report - Volume III - EKN

Surgil ESIA Report - Volume III - EKN

Surgil ESIA Report - Volume III - EKN

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

“O’ZLITINEFTGAZ” PC<br />

PFS “<strong>Surgil</strong> field complex costruction with valuable<br />

components retrieval”<br />

- control of parameters of technological processes;<br />

- data acquisition and transfer to control upper level.<br />

Offered functions of ACS TP:<br />

- conducting technological process in the automated mode;<br />

- account of products and reagents and automated calculation of their balance by<br />

installations;<br />

- automated control for quality of technological process passing;<br />

- remote control and submitting to the operator of the full information on a process<br />

course (technological parameters in measured points, conditions of stop, control<br />

valve, pumps and fans);<br />

- anti-damage protection of the control objects;<br />

- gassed condition control by the control objects;<br />

- archive (database) maintenance.<br />

Power supply ACS TP means is offered with use of sources of uninterruptable power<br />

supply (UPS).<br />

Camp<br />

Camp is located in northeast side at the distance of 500m from CGTU area.<br />

The general plan is decided with observance of sanitary and fire-prevention norms<br />

(figure 8).<br />

Camp includes the following objects:<br />

- living block-box for 4 persons, 11pcs;<br />

- living block-box for 4 persons, for travelling experts;<br />

- living block-box for 2 persons, 10pcs;<br />

- block-box for 2 persons, for travelling experts;<br />

- sauna (block-box);<br />

- first-aid post;<br />

- kitchen dining room for 24 person (block-box);<br />

- products warehouse (block-box);<br />

- leisure room (block-box);<br />

- toilet - shower cubicle of container type;<br />

- shadow summerhouse;<br />

- electrical switchboard room (block-box);<br />

- control post (block-box);<br />

<strong>Volume</strong> 2. Part 1. EIS Project for <strong>Surgil</strong> field construction<br />

65

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!