OAJ “O’ZLITINEFTGAZ”<br />

ПТЭО «Комплексное обустройство<br />

месторождения Сургиль с извлечением ценных<br />

компонентов»<br />

C O N C L U S I O N<br />

Recent years throughout the world, including in Uzbekistan, are characterized by<br />

ever increasing use of modern gas-chemical technologies.<br />

Thus, in particular, in the Republic of Uzbekistan on the basis of GCM Shurtan<br />

enacted and successfully operates Shurtansky gas complex with capacity of about 4 billion<br />

m3/year natural gas (125 thousand tons of polyethylene per year).<br />

This draft EIS is an analysis of the project construction and operation of gaschemical<br />

complex in Akchalak Kungrad area of the Republic of Karakalpakstan capacity for<br />

natural gas of about 3 billion m3/year.<br />

Environmental impact assessment of planned activities conducted on the basis of<br />

studies of economic, social and administrative aspects, as well as analysis of existing<br />

conditions and characteristics of the environment in the area of the proposed activity.<br />

We consider the initial state of socio-economic environment for Kungrad, as well as<br />

neighboring Muynak, districts, as well as socio-economic aspects of the organization and<br />

production work on the gas processing raw materials from the GCM <strong>Surgil</strong>.<br />

We analyzed the fundamental design decisions (sometimes similar, already existing<br />

production) have been identified and characterized the possible sources of exposure, the<br />

type and nature of exposure, as well as objects of the impact from an environmental point of<br />

view (including socio-economic impacts).<br />

Considered alternatives to the proposed activity and technological solutions.<br />

Described objectively existing danger of planned activities for both staff and the<br />

environment in the context of prevention of emergency situations, outlines measures to<br />

prevent possible adverse environmental impacts.<br />

The forecast of the possible impact of planned activities on the atmosphere, soil,<br />

groundwater and surface water, flora and fauna, as well as staff.<br />

Generalizing, we can say that the draft EIS assessed the environmental impact of<br />

large chemical facilities, shows a slight residual environmental effects, give an estimate of<br />

the socio-economic changes.<br />

In general, we can draw the following conclusions:<br />

- A project aimed at maintaining stability in the supply of its gas and plastic<br />

compounds;<br />

- The aim of the project is to increase hydrocarbon production, increasing the<br />

extraction of valuable components, and deeper dehydration marketable gas without<br />

significantly increasing anthropogenic pressures on the environment;<br />

- In social terms, the project will employ an additional number of local residents, to<br />

create comfortable conditions for staff;<br />

- The risk of accidents with significant consequences is low.<br />

Книга 2. Часть 2. Проект ЗВОС по строительству ГХК<br />

98