OAJ “O’ZLITINEFTGAZ”<br />
ПТЭО «Комплексное обустройство<br />
месторождения Сургиль с извлечением ценных<br />
компонентов»<br />
C O N C L U S I O N<br />
Recent years throughout the world, including in Uzbekistan, are characterized by<br />
ever increasing use of modern gas-chemical technologies.<br />
Thus, in particular, in the Republic of Uzbekistan on the basis of GCM Shurtan<br />
enacted and successfully operates Shurtansky gas complex with capacity of about 4 billion<br />
m3/year natural gas (125 thousand tons of polyethylene per year).<br />
This draft EIS is an analysis of the project construction and operation of gaschemical<br />
complex in Akchalak Kungrad area of the Republic of Karakalpakstan capacity for<br />
natural gas of about 3 billion m3/year.<br />
Environmental impact assessment of planned activities conducted on the basis of<br />
studies of economic, social and administrative aspects, as well as analysis of existing<br />
conditions and characteristics of the environment in the area of the proposed activity.<br />
We consider the initial state of socio-economic environment for Kungrad, as well as<br />
neighboring Muynak, districts, as well as socio-economic aspects of the organization and<br />
production work on the gas processing raw materials from the GCM <strong>Surgil</strong>.<br />
We analyzed the fundamental design decisions (sometimes similar, already existing<br />
production) have been identified and characterized the possible sources of exposure, the<br />
type and nature of exposure, as well as objects of the impact from an environmental point of<br />
view (including socio-economic impacts).<br />
Considered alternatives to the proposed activity and technological solutions.<br />
Described objectively existing danger of planned activities for both staff and the<br />
environment in the context of prevention of emergency situations, outlines measures to<br />
prevent possible adverse environmental impacts.<br />
The forecast of the possible impact of planned activities on the atmosphere, soil,<br />
groundwater and surface water, flora and fauna, as well as staff.<br />
Generalizing, we can say that the draft EIS assessed the environmental impact of<br />
large chemical facilities, shows a slight residual environmental effects, give an estimate of<br />
the socio-economic changes.<br />
In general, we can draw the following conclusions:<br />
- A project aimed at maintaining stability in the supply of its gas and plastic<br />
compounds;<br />
- The aim of the project is to increase hydrocarbon production, increasing the<br />
extraction of valuable components, and deeper dehydration marketable gas without<br />
significantly increasing anthropogenic pressures on the environment;<br />
- In social terms, the project will employ an additional number of local residents, to<br />
create comfortable conditions for staff;<br />
- The risk of accidents with significant consequences is low.<br />