“O’ZLITINEFTGAZ” PC<br />

PFS “<strong>Surgil</strong> field complex costruction with valuable<br />

components retrieval”<br />

application of nonflammable materials for heat- and sound insulation of<br />

pipelines and the equipment;<br />

equipping of the technological equipment by all necessary control devices,<br />

automatics, safety valves (drain, back valves, etc.), providing reliability<br />

and trouble-free operation;<br />

remote control of tap valves on the main gas pipeline, tap valves on the<br />

candles of pressure dumping in head gas pipelines;<br />

emergency lighting with supply by batteries;<br />

application of explosion-proof equipment for explosive zones;<br />

gas pipeline protection from electromagnetic induction, static electricity, and<br />

measures for prevention of high potentials bringing in buildings;<br />

usage of steel seamless pipes for gas pipelines and other technological<br />

pipelines with obligatory hydraulic test of each pipe at the factory of<br />

origin;<br />

usage of welded connections on gas pipelines and pipelines with explosivefire-hazardous<br />

and toxic substances;<br />

usage of shaped connections of pipelines (taps, tees, adapters) of the factory<br />

manufacturing, checked up and tested at factory;<br />

identification coloring of gas pipelines and other technological pipelines.<br />

With a view of protection of the personnel from thermal effect, the hot surfaces of the<br />

equipment and pipelines in the service area have a heat insulation providing temperature of hot<br />

surfaces in permissible by norms sanitary limits.<br />

Sewage waters<br />

Industrial sewage waters discharge is made in designed on CGTU sewerage<br />

network and further in ponds-evaporators. Household flows are discharged in rakings.<br />

Protection of land resources<br />

The construction organizations should reduce as much as possible use time of the<br />

lands, occupied under temporary using, strictly observe norms of duration and terms of<br />

lands restoration carrying out (under construction of the connecting gas pipeline and<br />

condensate line).<br />

Lands restoration is included in the general complex of works on construction of<br />

pipelines and is carried out in following sequence:<br />

- stripping of the soil fertile layer and its removal to temporary spoil.<br />

- construction of pipelines (earth, insulation-packing works, etc.)<br />

- distribution of surplus of the mineral ground which has remained after<br />

tranches filling, throughout restoration zone.<br />

- clearing of rubble and debris.<br />

- backspacing from the temporary spoil of the sfl and its uniform distribution<br />

within restoration zone.<br />

<strong>Volume</strong> 2. Part 1. EIS Project for <strong>Surgil</strong> field construction<br />

97

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!