“O’ZLITINEFTGAZ” PC<br />

PFS “<strong>Surgil</strong> field complex costruction with valuable<br />

components retrieval”<br />

INTRODUCTION<br />

This project of the statement for environmental impact (EIS project) is developed as<br />

ecological support (EIA I stage) of the pre-feasibility study (PFS) of the investments for<br />

“<strong>Surgil</strong> field complex construction with valuable components retrieval” object<br />

The reason for PFS development is decision of the President of the Republic of<br />

Uzbekistan from April, 11, 2006 and Memorandum of mutual understanding between<br />

“Uzbekneftegaz” NHC and "KOGAS" Korean Gas Corporation, from March, 29, 2006.<br />

PFS is executed according to task of “Uzbekneftegaz” NHC and<br />

“Uzgeoburneftegazdobycha” SC (“Ustyurtgaz” USE) approved by Cabinet of Ministers of<br />

the Republic of Uzbekistan on June, 12, 2006.<br />

There are solved the designing questions of <strong>Surgil</strong> GCF construction and gas main<br />

transport for gas and chemical processing. There are considered two variants of producing<br />

capacity of the design constructions – for 2 and 3 billion cubic m per annum.<br />

PFS purpose is definition of technological and economic rates of gas production and<br />

transport; definition of volumes of capital investments and an economic substantiation of<br />

investments into building constructions and definition of their efficiency.<br />

There is achieved completely use of the valuable components containing in natural<br />

gas of <strong>Surgil</strong> field during realization of this project (further with GCC putting into<br />

operation): ethane, propane-butane fraction, gas condensate. Also, there is achieved finest<br />

tank gas dewatering.<br />

Thus, necessity for urgent designing and object construction is actually and does not<br />

require additional proofs.<br />

Design object has character as resource-saving. Though, it is important to carry out<br />

the analysis of ecological aspects of planned activity on the earliest and following design<br />

stages.<br />

Procedure of the work execution was based on the standard methods of EIA<br />

procedure carrying out and took into consideration the features of considered object. There<br />

has been analyzed the information on emissions, dumps of pollutants into environment from<br />

operating in the region of construction during project execution.<br />

<strong>Volume</strong> 2. Part 1. EIS Project for <strong>Surgil</strong> field construction<br />