13.01.2015 Views

Surgil ESIA Report - Volume III - EKN

Surgil ESIA Report - Volume III - EKN

Surgil ESIA Report - Volume III - EKN

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

“O’ZLITINEFTGAZ”<br />

open joint-stock company<br />

FS «Complex development of <strong>Surgil</strong> field<br />

with extracting of valuable components»<br />

condensate with gasoline vapors tension by Raide is obtained.<br />

In case excess gas appears in compressor it is discharged to flare system:<br />

Pressure valve up along 1st layer of compressor intake capacitance of outgoing gas for 1 st layer;<br />

Pressure valve of upper product of 2 nd layer of compressor intake capacitance of outgoing gas for<br />

2 nd layer.<br />

Bottom product from stabilizer is sent to reactor where mercury removal occurs and is further<br />

mixed with unstable gas condensate in LPG fractionation column.<br />

Refrigerant system (Zone 111)<br />

Refrigerant system should be installed for additional cooling in GSP. Propane or propylene<br />

refrigerant unit consists of the closed loop where refrigerants are instantly separated, vaporized,<br />

compressed and condensed. The requirements for dehydration freezing at low tempreratures, mercury<br />

filtering device and ethane clearance device should be provided by cycle of regfrigirating medium<br />

Refrigerant compressor consists of three centrifugal compressors with electric engine drive.<br />

Refrigerant compressor protection is provided by the special anti-surging control.<br />

unit.<br />

Purified gaseous ethane is undergoing drying in molecular sieve dryer before entering ethane<br />

Energy resources requirements are given in table below. Pre-design assessment of energy<br />

consumption will be produced and approved during detailed engineering stage.<br />

Table 4 – Combined data on energy resources consumption<br />

Energy resources<br />

Requirement<br />

HP steam, kg/h 2,046<br />

MP steam, kg/h 7,372<br />

LP steam, kg/h 32,362<br />

Cooling water, kg/h 1,304,018<br />

Nitrogen, m 3 /h 801.0<br />

Instrument air, m 3 /h 819.0<br />

HP fuel gas, m 3 /h 18,758<br />

BFW, kg/h 660.0<br />

Demineralized water, kg/h 19,800<br />

Warm, cold and acid flare headers will be assembled in accordance with specific requirements.<br />

Design of preliminary operating conditions for these headers is performed according to the table<br />

below:<br />

Table 5 – Combined data on flare load<br />

Flare<br />

Flow rate<br />

(kg/h)<br />

Preliminary size of header<br />

(inches)<br />

Warm 437,372 30<br />

Book 5. Declaration of environmental impact concerning UGCC construction<br />

16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!