“O’ZLITINEFTGAZ” PC<br />

PFS “<strong>Surgil</strong> field complex costruction with valuable<br />

components retrieval”<br />

by explosive-fire-hazard. During design there have been taken into account requirements for<br />

necessary quantity of evacuation exits, and have been avoided crossings cargo and people<br />

streams. In case of explosion there are provided in explosive premises the easily dropped<br />

constructions. It can be window apertures and coverings. There are provided spark-proof<br />

floors in premises or constructions of categories: A, B, C.<br />

For fast response during emergencies origin on the industrial areas there is a complex<br />

of buildings and constructions of fire-prevention purpose:<br />

- pump stations of household and fire-prevention purpose;<br />

- fire-prevention water-supply tanks;<br />

- automatic firefighting pump stations;<br />

- automatic firefighting water tanks.<br />

There are provided following action for the purpose of decrease of production fire<br />

hazard:<br />

- all stop and safety valves is accepted by 1 class of flap tightness;<br />

- there are installed gassed condition signalling devices in explosive premises;<br />

- electric equipment in fire-explosive premises and on external areas is<br />

designed in explosion-proof version;<br />

- technological pipelines are laid underground or on fireproof support;<br />

- explosive- and fire-hazardous substances are removed from premise by<br />

exhaust ventilation system;<br />

- valves and pipeline are estimated on the pressure exceeding the maximum<br />

possible working pressure for reduction of emergency;<br />

- if the devices are stopped for repair the liquid rests are drained in the<br />

drainage tank, and gases are freeing on a torch.<br />

Antiseismic measures<br />

All buildings and constructions were designed taking into account seismicity:<br />

selection of all precast ferroconcrete and steel elements of the structures is executed by<br />

typical materials developed taking into account seismicity, the buildings foundations were<br />

are estimated on the special combination of loads, i.e. during action of seismic force.<br />

Thus, the provided antiseismic measures are directed on maintenance of reliable and<br />

safe use of buildings, constructions, and, accordingly process equipment operation.<br />

Technological communication<br />

The communication system is intended for operative and continuous control of<br />

technological processes, maintenance of effective interaction of the factory divisions, and<br />

also maintenance with communication of emergency, rescue and other services during<br />

liquidation of consequences of failures, acts of nature and other emergency situations.<br />

<strong>Volume</strong> 2. Part 1. EIS Project for <strong>Surgil</strong> field construction<br />

99

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!