13.01.2015 Views

Surgil ESIA Report - Volume III - EKN

Surgil ESIA Report - Volume III - EKN

Surgil ESIA Report - Volume III - EKN

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

“O’ZLITINEFTGAZ” PC<br />

PFS “<strong>Surgil</strong> field complex costruction with valuable<br />

components retrieval”<br />

There is not supposed considerable impact during object functioning on other<br />

components of environment (water, flora, fauna) during performance of the measures<br />

offered by the project for prevention or softening of the revealed possible adverse effects.<br />

Construction and operation process of planned object can also change of social and<br />

economic conditions of the vital activity of the population of nearby settlements.<br />

Offered design decisions are confirmation of ecological efficiency of project<br />

realization connected with improvement of the environmental conditions or its separate<br />

components, and also are directed to the prevention of ecological risks occurrence.<br />

The population living at distance from industrial objects will not feel special change<br />

because of local character of the given project operation.<br />

Sewage waters do not render direct impact on water objects. There is possible<br />

underground waters pollution as a result of a water filtration in the ponds-evaporators,<br />

however, during long operation of ponds their bottom has become covered by deposit layer<br />

interfering with filtration processes. Also, filtration process is interfered with structure of<br />

the underground waters having high density at the expense of high mineralization. Absence<br />

of organic pollution in the analysis of existing observation wells waters confirms the<br />

assumption of absence of underground waters pollution.<br />

Proceeding from the aforesaid, integrated assessment of the environmental condition<br />

in the region of planned construction has shown following results.<br />

Impact on atmosphere will rather increase, especially by nitrogen oxides, however, in<br />

whole, functioning of designed object practically will not change the established level of<br />

atmospheric air pollution.<br />

Impact on soil and vegetation will be expressed in violation of integrity of the soilvegetable<br />

cover during construction works execution and gas pipeline laying. Possibility of<br />

emergency condensate spills is not excluded during pipeline leakage. After execution of<br />

construction works on pipelines laying, all lands which have been allotted for temporary<br />

use, will be restored. There are build into estimate corresponding means for restoration. The<br />

emergency spills, which probability is extremely small in view of pipelines embodiment, do<br />

not represent considerable danger to environment (soils, water streams, atmospheric air).<br />

Failures are subject to the immediate liquidation, the polluted ground is subject to<br />

transportation, the failure site is exposed full restoration. Thus, it is possible to state, that<br />

design decisions provide the careful treatment of grounds and soils, provide conservation of<br />

their agricultural qualities.<br />

After restoration processes the vegetation during short time is completely restored.<br />

Accordingly, animals after construction termination have possibility to return to former<br />

inhabitation. Planned construction does not establish obstacles to migration of animals.<br />

The landscape will keep its modern appearance (will change not considerably).<br />

Considering the above-stated, health impact of the maintenance stuff and population<br />

through the way of pipelines routes will practically not be felt.<br />

<strong>Volume</strong> 2. Part 1. EIS Project for <strong>Surgil</strong> field construction<br />

111

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!