13.01.2015 Views

Surgil ESIA Report - Volume III - EKN

Surgil ESIA Report - Volume III - EKN

Surgil ESIA Report - Volume III - EKN

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

OAJ “O’ZLITINEFTGAZ”<br />

ПТЭО «Комплексное обустройство<br />

месторождения Сургиль с извлечением ценных<br />

компонентов»<br />

Oily waste water and discharges himzagryaznennye processed in lagoons and then<br />

with household effluent is subjected to biological treatment. Then the effluent is discharged<br />

to evaporation ponds.<br />

Solid waste is sand with gravel pads and sludge from vakuumfiltrov sludge<br />

dewatering.<br />

Akchalak gas-chemical complex refers to the objects of category I and provides<br />

energy from two independent sources (the main - proper gas piston power). On campus<br />

there are step-down transformer substation, transformer points, switchboards, cable<br />

transmission line.<br />

Gaseous emissions from the operations of gas-piston power plant. Liquid and solid<br />

wastes in large quantities is not formed.<br />

On campus there are office buildings, control rooms, dining rooms. Household<br />

sewage are sent to biological treatment, followed by evaporation ponds. Household waste<br />

landfilled.<br />

Ecological analysis of technology shows:<br />

- The construction Akchalak MCC will apply the latest technologies from abroad gas<br />

processing, equipment and materials imported complete delivery, which have a high<br />

technical level;<br />

- Will have reached a high level of extraction from natural gas deposits <strong>Surgil</strong><br />

valuable components - ethane, propane, butane, light condensate, natural gas, after drying<br />

with high quality is served in the main pipeline Hiva Beyneu;<br />

- Will be achieved high levels of carbon capture and disposal of oil from oily waste<br />

water (through a special design of separators;<br />

- The complex is equipped with a fuel system, which dispose of all flammable gas<br />

and liquid waste processing units and equipment that are used as fuel in the pyrolysis<br />

furnaces, steam generators, etc. Minimized the role of the external gas supply;<br />

- On a complex system will be implemented flare economy, which has an analog<br />

only Shurtan MCC. The torch is always in standby mode and only works when starting<br />

complex in the derivation of the working mode, or briefly at the relief device on the process<br />

equipment;<br />

- Solved the challenge of Uzbekistan's economy and exports in PE on the basis of<br />

advanced technology with minimal environmental risk.<br />

2.3 RESIDENTIAL VILLAGE<br />

Projected residential village located 3 km southwest of gas-chemical complex, next<br />

to the existing compressor station zhilposelkom Akchalak.<br />

Master plan designed to meet the rational allocation of facilities, the wind rose,<br />

building requirements, terrain and the organization of the entrances of the projected road to<br />

GCMR.<br />

Книга 2. Часть 2. Проект ЗВОС по строительству ГХК<br />

40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!