“O’ZLITINEFTGAZ”<br />

open joint-stock company<br />

FS «Complex development of <strong>Surgil</strong> field<br />

with extracting of valuable components»<br />

INTRODUCTION<br />

This work is the second stage of the «Environmental impact assessment» procedure carried out<br />

relating to UGCC construction in Kungrad district of the Republic of Karakalpakstan, 3km northeast<br />

from a dwelling settlement close to Akchalak railway station.<br />

The purpose of UGCC construction is the deep processing of gas to arrange production of<br />

different kinds PP and PE. Annually 4.5 billion cubic meters of natural gas will be processed. The main<br />

product to be manufactured is PE in amount of 383,000 tons annually. Besides PE also PP will be<br />

manufactured in amount of 81,000 tons annually as well as gas condensate will be recovered from<br />

natural gas (103,000 tons annually) for further refining.<br />

The base for «Declaration of environmental impact» elaboration is the target specification by «Uz-<br />

Kor Gas Chemica»l JV LLC for feasibility study of the «Complex development of <strong>Surgil</strong> field with<br />

extracting of valuable components» investment project as well as the Conclusion of the State<br />

environmental expertise of the Republic of Uzbekistan №18/56z dated February the 23 rd 2007<br />

concerning DEI project.<br />

DEI project concerning Complex development of <strong>Surgil</strong> field with extracting of valuable<br />

components (Part 2 UGCC construction) was elaborated at the stage of selection of rational placement<br />

and the most effective technical, organizational and economic decisions relating to the Project<br />

realization (pre-feasibility study). According to the results of the expertise of DEI project it became<br />

necessary to develop DEI concerning UGCC construction at the stage of the feasibility study of the<br />

Project.<br />

According to the Conclusion of the State environmental expertise when performing DEI it is<br />

necessary to take into account the following:<br />

• detailed consideration of hydrological and geological engineering survey of UGCC site;<br />

• analysis of alternatives for the process waste waters contaminated with chemicals<br />

disposal;<br />

• consideration of the measures on prevention negative consequences of the Project<br />

implementation;<br />

• carrying out an analysis of the extent of air pollution by the total emissions from CS-<br />

Akchalak.<br />

DEI is elaborated in accordance with the Regulations for the State ecological expertise acting in<br />

the Republic of Uzbekistan approved by the Resolution of the Cabinet of Ministers №491 dated<br />

December the 31 st 2001 as well as in accordance with the other acting normative documents of the<br />

Republic of Uzbekistan concerning environmental protection.<br />

Book 5. Declaration of environmental impact concerning UGCC construction<br />

8